background image

23

MMD24S
MMD24B

(1) Structure of Humidity Sensor
 

The humidity sensor includes two thermistors as shown 
in the illustration. One thermistor is housed in the closed 
vessel filled with dry air while another in the open vessel. 
Each sensor is provided with the protective cover made of 
metal mesh to be protected from the external airflow.

(2) Operational Principle of Humidity Sensor
 

The  figure  below  shows  the  basic  structure  of  an 
absolute humidity sensor. A bridge circuit is formed by 
two thermistors and two resistors (R and R2).

 

The output of the bridge circuit is to be amplified by the 
operational amplifier.

 

Each thermistor is supplied with a current to keep it heated 
at about 50

ο

C (302

ο

F), the resultant heat is dissipated 

in the air and if the two thermistors are placed in different 
humidity conditions they show different degrees of heat 
conductivity  leading  to  a  potential  difference  between 
them causing an output voltage from the bridge circuit, the 
intensity of which is increased as the absolute humidity 
of  the  air  increases.  Since  the  output  is  varied  every 
minute, it is amplified by the operational amplifier.

(3) Detector Circuit of Humidity Sensor Circuit
 

This detector circuit is used to detect the output voltage 
of  the  absolute  humidity  circuit  to  allow  the  LSI  to 
control sensor cooking of the unit.  When the unit is set 
in the sensor cooking mode, 6 seconds clearing cycle 
occurs  than  the  detector  circuit  starts  to  function  and 
the LSI observes the initial voltage available at its AN6 
terminal.

 

With  this  voltage  given,  the  switches  SW  to  SW5  in 
the LSI are turned on in such a way as to change the 
resistance values in parallel with R45 ~ R49. Changing 

HUMIDITY SENSOR CIRCUIT

the resistance values results in that there is the same 
potential at both F-3 terminal of the absolute humidity 
sensor and AN6 terminal of the LSI. The voltage of AN7 
terminal will indicate about +2.5V. This initial balancing is 
set up about 6 seconds after the unit is put in the Sensor 
Cooking mode.  As the sensor cooking proceeds, the food 
is heated to generate moisture by which the resistance 
balance of the bridge circuit is deviated to increase the 
voltage available at AN6 terminal of the LSI.

 

Then the LSI observes that voltage at AN7 terminal and 
compares it with its initial value, and when the comparison 
rate reaches the preset value (fixed for each menu to 
be  cooked),  the  LSI  causes  the  unit  to  stop  sensor 
cooking; thereafter, the unit goes in the next operation 
automatically.

 

When the LSI starts to detect the initial voltage at AN7 
terminal 6 seconds after the unit has been put in the 
Sensor  Cooking  mode,  if  it  is  not  possible  to  balance 
the bridge circuit due to disconnection of the absolute 
humidity sensor, ERROR will appear on the display and 
the cooking is stopped.

ventilation opening for sensing

Sensing part
(Open vessel)

Sensing part
(Closed vessel)

Thermistors

S

C

R3

R

R2

+

Operational
amplifier

Output
voltage

S : Thermistor
     open vessel

C : Thermistor
      closed vessel

2

Absolute humidity (g/m  )

O

utput voltage

Absolute humidity vs,
output voltage characteristic

R43 1.8K

VA : +15V

VC : +5V

R4

2 3.5

7K

R4

13.3

2K

S

C

R51 47K

R45 620K

R46 300K

R47 150K

R48 75K

R49 37.4K

R44 360K

R50 10K

3

F2

8

4

1

2

IC5

+

-

R40

430

C42

0.1µ

F

D40

D41

R52 47K

86

63

P04

P03

P02

P01

P00

AN6

SW1

SW2

SW3

SW4

SW5

AN7

LSI
(IC1)

64

52

51

50

49

48

C. Thermistor in

closed vessel

S. Thermistor in

open vessel

F3

F1

Содержание MMD24S

Страница 1: ...y high voltage and current Contact with the following parts may result in a severe possibly fatal electrical shock High Voltage Capacitor High Voltage Power Transformer High Voltage Rectifier and Heat...

Страница 2: ...r seal and microwave generation and transmission systems shall be repaired replaced or adjusted by procedures described in this manual before the oven is released to the owner e A microwave leakage ch...

Страница 3: ...neccessary covers 2 Open the drawer and keep it open 3 Discharge high voltage capacitor 4 Disconnect the leads to the primary of the power transformer 5 Ensure that the leads remain isolated from othe...

Страница 4: ...275 15 ml 9 8 oz of tap water initially at 20 5O C 68O F in the center of the oven cavity The water container shall be a low form of 600 ml 20 oz beaker with an inside diameter of approx 8 5 cm 3 1 2...

Страница 5: ...he door brackets and hinges are not defective C The door packing is not damaged D The door is not deformed or warped E There is no other visible damage with the oven Servicing and repair work must be...

Страница 6: ...ull power throughout the cooking time P 90 approx 90 of Full Power P 80 approx 80 of Full Power P 70 approx 70 of Full Power P 60 approx 60 of Full Power P 50 approx 50 of Full Power P 40 approx 40 of...

Страница 7: ...vided When installing this appliance observe all applicable codes and ordinances Where a two pronged wall receptacle is encountered it is the personal responsibility and obligation of the customer to...

Страница 8: ...to the stir fan motor the cooling fan motor and the high voltage componentsarede energized theovenlampremainson and the digital read out displays the time still remaining in the cook cycle when the d...

Страница 9: ...ooking Sequence 1 Touch one of the SENSOR pads NOTE The oven should not be operated on sensor immediately after plugging in the unit Wait two minutes before cooking on SENSOR 2 The coil of shut off re...

Страница 10: ...TO SOURCE TO LOAD TO LOAD TO SOURCE SWITCHING SWITCH DOOR SENSING SENSOR FAN MOTOR HUMDITY F3 F2 F1 SM FM OL A3 COM N O STIRRER MOTOR OVEN LAMP SECONDARY INTERLOCK SWITCH RY3 RY1 RY2 CAPACITOR xxx F A...

Страница 11: ...covers 2 Open the drawer and block it open 3 Discharge high voltage capacitor 4 Replace the Keyboard unit 5 Reconnect all leads removed from components during testing 6 Re install the covers 7 Reconn...

Страница 12: ...regurator for drawer motor 8 Disconnect the power supply cord and then remove outer case 9 Open the door and block it open 10 Discharge high voltage capacitor 2 Open the drawer and block it open 3 Dis...

Страница 13: ...tor has been burned replace the power unit 7 Examine the touch control transformer with a tester for the presence of layer short circuit check the primary coil resistance which is approximately 151 6...

Страница 14: ...n cavity 3 Close the drawer 4 Touch the TIMER CLOCK pad once the POWER LEVEL pad twice and the START pad once And touch the number pads 1 once and the number pad 4 once Now the oven is in the sensor c...

Страница 15: ...supply cord 9 Check the sensor cook operation proceed as follows 9 1 Close the door Touch the TIMER CLOCK pad once the POWER LEVEL pad twice and the START pad once And touch the number pads 1 once an...

Страница 16: ...igital read out countdown 3 Remove the cup from the oven and again measure the temperature making sure to stir the thermometer or thermocouple through the water until the maximum temperature is record...

Страница 17: ...meter should indicate a closed circuit When the monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate of the oven cavity with the drawer opened in this co...

Страница 18: ...E FILAMENT AND HIGH VOLTAGE 2 Open the drawer and block it open 3 To discharge high voltage capacitor wait for 60 seconds 4 If the monitor fuse is blown when the drawer is opened check the primary int...

Страница 19: ...n power is supplied 5 Indicator Circuit A circuit to drive the Liquid Crystal Displays LCD1 6 Power Source Circuit This circuit generates voltages necessary in the control unit from the AC line voltag...

Страница 20: ...k oscillation frequency control output Output to control oscillation input of Xin 14 VCC IN Power source voltage 5V VC voltage of power source circuit input 15 P60 IN Plus signal coming from the Micro...

Страница 21: ...line key on matrix is touched 39 P15 OUT Key strobe signal Signal applied to touch key section A pulse signal is input to P20 P23 terminal while one of J 10 line key on matrix is touched 40 P14 OUT Ke...

Страница 22: ...IN Signal to synchronize LSI with commercial power source frequency This is the basic timing for all real time processing of LSI 61 AVSS IN A D converter power source voltage The power source voltage...

Страница 23: ...as to change the resistance values in parallel with R45 R49 Changing HUMIDITY SENSOR CIRCUIT the resistance values results in that there is the same potential at both F 3 terminal of the absolute humi...

Страница 24: ...l and the oven itself is so short that the two can t be separated For those models check and repair all the controls sensor related ones included of the touch control panel while keeping it connected...

Страница 25: ...alloy solder it is recommend that a dedicated bit is used and that the iron temperature is adjusted accordingly 3 Soldering As the melting point of lead free solder Sn Ag Cu is higher and has poorer...

Страница 26: ...rts Ovenlamp Magnetron Highvoltagetransformerand Oven cavity WARNING FOR WIRING 1 Disconnect the power supply cord 2 Make sure that a definite click can be heard when the microwave oven drawer is unla...

Страница 27: ...s the 4 mounting screws holding the unit on to the wall or cabinet opening Fig 1 3 Close Drawer and carefully pull the unit out from opening and unplug the power supply cord 4 Remove top cover Fig 2 5...

Страница 28: ...the black and white AC terminals from the Noise Filter PWB and green ground wire from the back plate Fig 4 2 Attach the black and white AC terminals from the new Power Cord to the Noise Filter as sho...

Страница 29: ...r and lower position of the latch hook should be less than 0 5mm The vertical position of the latch hook should be adjusted so that the secondary interlock switch is activated with the drawer closed T...

Страница 30: ...wing A Make sure that drawer sensing switch secondary interlock switch and monitor switch are operating properly Refer to chapter Test Procedures B An approved microwave survey meter should be used to...

Страница 31: ...SWITCH ANGLE REMOVAL Fig S 1 Fig S 2 ACTUATOR REMOVAL ADJUSTMENT 1 Follow the Microwave Drawer disassembly as previously stated 2 Open the drawer and keep it open 3 To discharge the high voltage capac...

Страница 32: ...ation 1 Proceed in reverse to reinstall the Auto Drawer Gear taking care that the gear teeth are set into the cavity angle correctly Fig G 2 RACK GEAR REMOVAL 1 Follow the Microwave Drawer disassembly...

Страница 33: ...G or YLW RED RED GRY BLK WHT NOISE FILTER BOARD N H WHT COM YLW or BLK RED THIRD DOOR SWITCH N O YLW or ORG WHT ORG CONTROL UNIT CNK CNM CNN CNE SWITCHING POWER SUPPLY CN501 CN502 T1 1 2 3 4 5 GRN BLU...

Страница 34: ...O D7 RY1 COM N O D10 RY3 D11 RY4 D12 RY5 H 1 H 3 H 2 H 4 H 5 H 7 H 6 AC 120V MICRO COM O L FM SM 0 1uF 50V NOTE IF NOT SPECIFIED 1SS270A 10G471K A 5 A 1 H 8 1 3 8 5 B 1 C10 C11 NOT INSERT PARTS T1 VR...

Страница 35: ...1 K 5 4 7K R56 C52 M 5 4 7K 10K 10K R58 C51 R55 R57 SP D19 D20 Q22 Q21 C20 C21 Q20 AN5 CF1 4MHz 1 2 3 7 5 6 CONTROL UNIT 4 7K R13 4 7K R12 P05 P51 P57 C3 S22 S23 SEG22 SEG23 COM2 10uF 35V VR GND INT 4...

Страница 36: ...C D E F G H A B C D E F G H Figure S 4 Printed Wiring Board of Power Unit 2 5A 3 1 2 FUSE T1 4 8 D3 ZD1 J10 RY1 D12 RY5 DIP CNH Q1 R1 D2 D1 1 11 D4 1 1 R10 C10 RY2 1 3 P 3 D11 D10 7 CNA CNB C11 R11 RY...

Страница 37: ...S0 S0 S24 C4 C5 R29 CF2 S24 C4 C5 C3 S0 C0 SP C90 C8 C6 C5 C3 C21 R27 R26 R28 C90 C90 R98 R96 R99 R95 D96 K D95 K D97 K Q97 R97 R41 J2 J1 J4 J6 K J3 C5 C6 D19 K D20 K ZD2 R7 1 1 8 6 Q26 WHA Q23 Q21 Q...

Страница 38: ...INC ALL RIGHTS RESERVED Nopartofthispublicationmaybereproduced stored in retrieval systems or transmitted in any form or by any means electronic mechanical photocopying recording or otherwise without...

Отзывы: