English 23
Installation instructions
Supplied parts
The following parts make up the LP conversion kit:
DG69-00549A
(PAD SHEET)
LR(WHT)
LF(WHT)
RF(RED)
RR(YEL)
CENTER
Out(PURPLE)
In(GRAY)
ORIFICES/ORIFICES/ORIFICIOS
DTG30P875N*/DTG36P875N*
The all orifices’ positions are marked on the provided sheet. The spud in the
pressure regulator is factory-installed for Natural Gas (NG) use. LP conversion
requires spud removal and reinstallation for LP use.
BURNER ORIFICE SIZES AND OUTPUT RATINGS
(LP Gas [Propane] 10 in WCP)
Burner Location
BTU Rate
Orifice size [mm]
RF
11,500
1.04
LF
7,500
0.83
RR
4,000
0.62
LR
7,500
0.83
Center
14,500
In: 0.46 / Out: 0.74 (2 pcs)
BURNER ORIFICE SIZES AND OUTPUT RATINGS
(Natural Gas 5 in WCP)
Burner Location
BTU Rate
Orifice size [mm]
RF
13,000
1.64
LF
9,500
1.40
RR
5,000
1.01
LR
9,500
1.40
Center
19,000
In: 0.70 / Out: 1.30 (2 pcs)
NOTE
115
Orifice markings:
115 – Denotes 1.15 mm orifice size opening.
Install_DTG36P875N_DG68-01286A-00_EN+MES+CFR.indb 23
2020-05-27 �� 11:00:39
Содержание DTG36P875N Series
Страница 27: ...Memo Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 27 2020 05 27 11 00 41...
Страница 28: ...Memo Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 28 2020 05 27 11 00 41...
Страница 29: ...Memo Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 29 2020 05 27 11 00 41...
Страница 59: ...Notas Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 27 2020 05 27 11 00 56...
Страница 60: ...Notas Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 28 2020 05 27 11 00 56...
Страница 61: ...Notas Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 29 2020 05 27 11 00 56...
Страница 91: ...Notes Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 27 2020 05 27 11 01 10...
Страница 92: ...Notes Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 28 2020 05 27 11 01 10...
Страница 93: ...Notes Install_DTG36P875N_DG68 01286A 00_EN MES CFR indb 29 2020 05 27 11 01 10...