![Da-Lite TENSIONED PROFESSIONAL ELECTROL Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/da-lite/tensioned-professional-electrol/tensioned-professional-electrol_instruction-book_495354002.webp)
PRE-INSTALLATION
1
1. Carefully unpack screen.
2. Make sure to recheck measurements of screen location before installation.
3. Remove instruction cover plate (Fig. 1). Do not remove wrapping paper until screen is installed.
4. Remove the retainer screws from the slat bar before the case has been installed (Fig. 2).
INSTALLATION
Hangers (If required)
1. Make sure a hanger is approximately 11-1/2" from each end of case.
2. Place third hanger on the center line of the fabric.
Installation
1. Level unit lengthwise with a carpenter’s plum level.
CAUTION! DO NOT COMPLETELY SEAL IN UNIT. ACCESS ROOM MUST BE ALLOWED FOR MOTOR REPAIR OR FABRIC
REPLACEMENT.
2. Remove shipping brace by removing 2 hex head screws (Figure 3).
3. Remove wrapping paper.
CAUTION! DO NOT CUT WRAPPING PAPER WITH KNIFE OR ANY SHARP TOOL. REMOVE BY HAND.
4. Install electrical hook up that applies to your unit. Make sure to review your Electrical Installation Checklists and
wiring diagrams (included) for either 110 volt switch, 220/240 volt switch, or DRC low voltage control.
5. Test installation by carefully running surface up and down several times. Be prepared to stop screen.
NOTE: The picture surface, when rolled down, should have at least a full wrap and a half around the roller. Do not allow any
part of the roller to become exposed.
s
!
s
!
FIGURE 1
CASE
INSTRUCTION COVER
FIGURE 2
SLAT RETAINER BRACKET
(3 SCREWS)
1 ON BOTTOM OF SLAT
2 ON INSIDE OF CASE
Содержание TENSIONED PROFESSIONAL ELECTROL
Страница 7: ...6 ...