10
Installation (continued)
18. Feed the first rope (N) through the large hole on the audience
left hoisting bracket (H) so that the knotted end makes
contact with the inside of the bracket. Then, feed the rope (N)
through the audience left lifting bracket (D) that was installed
into the wall opening behind the T-track (B) (See Figure 6).
19. Repeat for the second rope (N) through the center and the
third rope (N) through the audience right hoisting (H) and
lifting brackets (D) (See Figure 6).
NOTE:
At this point, all three ropes (N) should be fed through
the hoisting (H) and lifting brackets (D). There will be no rope
(N) placed through the single hoisting bracket (H) on the
bottom of the screen. On the rear (projector side) of the wall
opening, a person will be needed in the following steps to
guide the three ropes (N) as the screen is being lifted.
WARNING: Screen must be positioned close to, but not
touching, the wall before lifting. Do not lift the screen into
place if the ropes have not been fed through the hoisting
(H) and lifting brackets (D).
Figure 6
Figure 7
20. Lift the screen assembly to a vertical position on the floor
parallel to the wall opening. On the projector side of the wall
opening, one person will be holding all three ropes (N)
without slack and guiding the screen to an upright position.
On the audience side of the wall opening, to lift there should
be one person on the left side of the screen, one person on
the right and one person supporting the top center of the
screen frame at the center hoisting bracket (H). After this step
is completed the screen will be standing on the floor in front
of the wall opening (See Figure 7)
CAUTION: Do not allow the screen to twist or bow during
this step. Without careful lifting, there is potential to
crack, break or shatter the screen surface. Four people
must be used during this step.
Hoisting Brackets
Lifting Brackets