background image

10

Installation (continued)

18.  Feed the first rope (N) through the large hole on the audience 

left hoisting bracket (H) so that the knotted end makes 
contact with the inside of the bracket. Then, feed the rope (N) 
through the audience left lifting bracket (D) that was installed 
into the wall opening behind the T-track (B) (See Figure 6).

19.  Repeat for the second rope (N) through the center and the 

third rope (N) through the audience right hoisting (H) and 
lifting brackets (D) (See Figure 6).

 

NOTE:

 At this point, all three ropes (N) should be fed through 

the hoisting (H) and lifting brackets (D). There will be no rope 
(N) placed through the single hoisting bracket (H) on the 
bottom of the screen. On the rear (projector side) of the wall 
opening, a person will be needed in the following steps to 
guide the three ropes (N) as the screen is being lifted.

 

WARNING: Screen must be positioned close to, but not 
touching, the wall before lifting. Do not lift the screen into 
place if the ropes have not been fed through the hoisting 
(H) and lifting brackets (D).

Figure 6

Figure 7

20. Lift the screen assembly to a vertical position on the floor 

parallel to the wall opening. On the projector side of the wall 
opening, one person will be holding all three ropes (N) 
without slack and guiding the screen to an upright position. 
On the audience side of the wall opening, to lift there should 
be one person on the left side of the screen, one person on 
the right and one person supporting the top center of the 
screen frame at the center hoisting bracket (H). After this step 
is completed the screen will be standing on the floor in front 
of the wall opening (See Figure 7)

 

CAUTION: Do not allow the screen to twist or bow during 
this step. Without careful lifting, there is potential to 
crack, break or shatter the screen surface. Four people 
must be used during this step. 

Hoisting Brackets

Lifting Brackets

Содержание 29526

Страница 1: ...INSTRUCTION BOOK FOR Polacoat Flex Plex Screen ...

Страница 2: ...o change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Da Lite is a registered trademark of Milestone AV Technologies All rights reserved Installation Video To view a video...

Страница 3: ...quired for Installation not provided Screw Gun Drill and Drill Bits 1 2 Open Wrenches 2 Ladders 10 x 1 Countersunk Flat Head Screws x 1 Hex Lag Screws 1 8 3 16 Hex Keys Measuring Tape Level Rubber Mallet Knife ...

Страница 4: ...24 Tensioning Assemblies G 6 Frame Pieces F 4 Rubber Gaskets B 6 T Tracks D 3 Lifting Brackets I 4 Cap Screws NOTE Quantities listed are for standard sizes Quantities will vary if a custom screen that is larger than standard is ordered Q 4 Corner Covers L 24 3 8 x 1 2 Hex Head Screws M 24 3 8 Thin Hex Nut K 4 Corner Bracket J 4 Seam Bracket ...

Страница 5: ...d transport the carton carefully DO NOT remove the screen surface roll and hardware from the carton for transport CAUTION Do not remove the screen surface and hardware from the end of the carton Removing the carton ends will expose staples that can scratch the screen surface 3 Using four people unroll the screen A Locate one person on each end of the roll with the other two people used as support ...

Страница 6: ...is against the wall Secure that end of the track with a 10 screw in the hole closest to the end See Figure 2 Figure 1 2 NOTE Most screen units will have one piece of T track B for the side openings and two pieces each for the top and bottom wall openings Larger sized units above 14 wide may have three pieces of T track B each for the top and bottom openings WARNING Ensure each 10 countersunk screw...

Страница 7: ...aching the T track B to the wall This alignment is necessary to allow the trim to snap on easily at the end of the screen installation Ensure the opening is level on all four sides If the opening is not level the T track B will need to be shimmed in order to ensure the screen trim is level once attached to the T track B Figure 2 Figure 3 Installation continued 6 Repeat Steps 4 and 5 until all T tr...

Страница 8: ... the top section of the screen in the opposite corner See Figure 4 9 Position the third lifting bracket D 2 from the back of the T track B in the center of the top section of the wall opening and mount with 1 4 X 1 lag screws See Figure 4 NOTE After completing this step there should be three lifting brackets D mounted into the top section of the wall opening behind the T track B Check that these b...

Страница 9: ...f needed See Figure 5 Installation continued 13 Place the hoisting bracket H in the center of the top and bottom sections of the screen frame Attach to frame using the provided cap screws I and a 3 16 hex key 14 Starting from the center on each side tighten all set screws on all four sides of the frame using the 1 8 hex key Approximately two threads should be visible on each set screw when properl...

Страница 10: ...RNING Screen must be positioned close to but not touching the wall before lifting Do not lift the screen into place if the ropes have not been fed through the hoisting H and lifting brackets D Figure 6 Figure 7 20 Lift the screen assembly to a vertical position on the floor parallel to the wall opening On the projector side of the wall opening one person will be holding all three ropes N without s...

Страница 11: ...sembly into place until all three hoisting and lifting brackets attach to each other at the top of the wall opening See Figure 8 Figure 8 T Track 2 Lifting Bracket Hoisting Bracket Screen Assembly Audience Side 22 Once the screen is hanging on the hoisting and lifting brackets carefully remove the seam J and corner K brackets along with the 3 8 screws L and nuts M NOTE During this step be careful ...

Страница 12: ...TE Once the lifting brackets have been removed the screen assembly will be held in place by the previously attached tensioning assemblies 26 Tighten all tensioning assemblies O on the top section of the screen assembly until all eight four per frame section are evenly spaced and secure on the top side NOTE Use the alternating method of two to three turns on one assembly then moving to another asse...

Страница 13: ...gure 10 NOTE Custom screens may use three pieces 32 Starting at the audience side bottom left corner align a side piece of trim P with the side edge of the screen The end should be approximately 3 up from the corner of the wall opening When aligned snap the trim P onto the T track while moving along the length of the piece until firmly in place Figure 10 33 Repeat Step 31 for the top trim pieces P...

Страница 14: ... at Da Lite s option the defective part of the merchandise Returns for service should be made to your Da Lite dealer If it is necessary for the dealer to return the screen or part to Da Lite transportation expenses to and from Da Lite are payable by the purchaser and Da Lite is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepa...

Отзывы: