D2G gravitee GK-2009 Скачать руководство пользователя страница 7

© 2023

Step 3 of 5

Order #XXXXX

Locked layer contains

placeholder marks.

5

7

Counter Top

Floor

Pin

Pin

Pin

Pin

Shelf

Monitor

Mount

Infill

Infill

4

3

6

Bolt

4

1

2

6

8

Steps:

1) Attach [4] and [5] between [1] [2] and [3].

2) Slide floor between [1] [2] and [3] to rest on [4] and [5].

3) Insert pins into [1] [2] and [3] where shown.

4) Slide shelf between [1] [2] and [3] to rest on pins.

5) Slide infill between [2] and [3].

6) Attach [6] and [7] between [1] [2] and [3] to secure infill.

7) Lock counter top to [6]. See 

Counter Top Lock

 detail.

8) Attach [8] to counter top, using bolt.

9) Attach monitor mount to [8]. See 

Monitor Mount

 detail.

10) Attach monitor to mount then route monitor cord thru

      conduit. See 

Cord Management

 detail.

Completed Assembly

*

Monitor Mount

V4 Connectors

*

Slide connectors into groove

of extrusion. Tighten set screws

to secure connectors in place.

Attach monitor mount back

plate to extrusion, using bolts.

Bolts

Monitor

Mount

Align hole with pin

Rotate pin. Spring

will push pin into hole.

Counter Top Lock

1

2

*

Pin

Hole

*

*

Cord Management

Route cord through conduit.

Attach conduit by pinching

the opening and inserting

into the groove of extrusion.

pinch

Cord

PR63 Conduit

Keep conduit attached to [

8

], when packing.

Item

1

2

3

4

5

6

7

8

Qty.

1

1

1

2

1

2

1

1

Description

38” GS210 Vertical Extrusion

38” S30 Vertical Extrusion

38” S30 Vertical Extrusion

18.8496” Z45 Curved Extrusion

21.7196” Z45 Curved Extrusion

18.8496” Z45 Curved Extrusion

21.7196” Z45 Curved Extrusion

36” S44 Vertical Extrusion

MOD-1561 Monitor Stand Assembly

Содержание gravitee GK-2009

Страница 1: ...2023 Order XXXXX Top View 20 10 GK 2009 10 x 20 Display If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INSTRUCTIONS...

Страница 2: ...2023 Order XXXXX 1 sq foot GK 2013 Plan View...

Страница 3: ...e Heat and UV exposure will warp and fade components Retain all provided Packing Materials All provided packing materials are for ease of repacking component protection Disassembly For loss prevention...

Страница 4: ...2023 Crate 1 of 1 Order XXXXX CRATE PACKING Crate Packing...

Страница 5: ...ed Gravitee Panel 46 w x 95 h curved Gravitee Panel 95 h Gravitee hinged connector 28 5 w x 95 h Gravitee Panel 28 5 w x 95 h Gravitee Panel 46 w x 95 h curved Gravitee Panel 46 w x 95 h curved Gravit...

Страница 6: ...ete the installation of the corners Graphic Removal To remove the graphic from the frame locate the fabric pull tab Gently pull up on the tab to remove the fabric Step 3 Once all corners are inserted...

Страница 7: ...t detail Completed Assembly Monitor Mount V4 Connectors Slide connectors into groove of extrusion Tighten set screws to secure connectors in place Attach monitor mount back plate to extrusion using bo...

Страница 8: ...38 h curved Gravitee Panel 18 327 w x 38 h curved Gravitee Panel 37 5 h Gravitee Hinged Connector 11 5 w x 38 h Gravitee Panel 37 5 h Gravitee Corner Post w caps w caps door hinge 37 094 w Z45 Horizon...

Страница 9: ...fabric to outside into the channel Repeat for other side of this corner Step 2 Repeat Step 1 for opposite corner C then insert corner B followed by corner D to complete the installation of the corner...

Отзывы: