86
Using H.323 Protocol
H.323 Production Test
In this test, packets containing 1 to 100mbps are transmitted and continue to
be transmitted until the user ends the test by pressing any
valid
key on the
keypad. This test does not play any tone, since the H.323 phone cannot check
if the test is successful.
Ethernet Transmit Test
In this test a packet that is sent from the Ethernet driver is received back and is
verified. If the test is successful,
Success
will appear in the browser; otherwise
an
Error
message appears. It will take some time for
Success
or
Error
to ap-
pear, as it takes some time for the driver to receive the packet from network.
The user must use a
100 Mbps Switch (full duplex mode)
and connect any two
ports for loop-back.
Note: The user can press ‘0’ to repeat the test, or ‘1’ to exit the production test
mode.
Ethernet Receive Test
Содержание DPH-80
Страница 1: ...Manual Building Networks for People D Link DPH 80 IPPhone Version 1 10 ...
Страница 22: ...22 Configuration Upload Using Media Gateway Control Protocol MGCP General Configuration Configuration Download ...
Страница 100: ...100 Register online your D Link product at http support dlink com register Registration ...