background image

5

EN

G

LI

SH

Grounding the Switch

To use the DIS-200G safely, it needs to be grounded. 

Please complete these steps before powering-on 

the switch.

Note:

The grounding screw of the chassis must be 

properly connected to the protective earthing 

of building in compliance with local regulatory 

guidelines by using a green-and-yellow grounding 

cable with the minimum wire gauge 0.75 mm2. 

Use the following instructions to ground the 

DIS-200G:

1.  Remove the grounding screw from the top of the 

DIS-200G and place the grounding cable lug ring 

on top of the grounding screw opening.

2.  Insert the grounding screw back into the 

grounding screw opening and use a screwdriver 

to tighten the grounding screw, securing the 

grounding cable to the DIS-200G.

3.  Attach the terminal lug ring at the other end of the 

grounding cable to an appropriate grounding source.

4.  Verify that the connection between the 

grounding connector on the DIS-200G and the 

grounding source is secure.

Connecting to a Power Source

The DIS-200G can be powered using a power 

adapter (optional) or by using the in-built terminal 

connector. This allows dual power inputs, using wires 

from the power source(s) screwed-in to the terminal 

connections.

Using the Power Adapter (Optional)

Use the following instructions to power the DIS-200G 

using the power adapter (optional):

1.  Connect the supplied power adapter to the 

power connector on the back of the DIS-200G. 

Connect the other end of the power adapter to 

a mains power source.

Figure 11

Using the Terminal Connections

Before proceeding, ensure that all power sources 

have been disconnected from the DIS-200G, and that 

the power source you are wiring to the DIS-200G is 

also disconnected.

Use the following instructions to power the DIS-200G 

using the terminal connections:

1.  Before continuing, consult the diagram below to 

decide which wires from the power source need 

to connect to which contacts on the terminal 

block. Note that two power sources can be used; 

one inserted into V1-/V1+ (labeled PWR1) and 

the other inserted into V2-/V2+ (labeled PWR2). 

If you only wish to use one power source, insert 

the wires into V1-/V1+ (PWR1). This diagram is 

also provided on the DIS-200G:

Figure 12

Содержание Dis-200G Series

Страница 1: ...rough the basic installation process for your new D Link Industrial Ethernet Switch DIS 200G Series Quick Installation Guide Industrial Ethernet Switch Quick Installation Guide Documentation is also a...

Страница 2: ......

Страница 3: ...s connected at 1 Gbps Blinking green There is activity on the port at 1 Gbps Table 1 DIS 200G 12PS PSW Before You Begin This Quick Installation Guide gives you step by step instructions for setting up...

Страница 4: ...12 These are 1 Gbps SFP ports that can be used to connect to other switches using compatible SFP adapters and fiber cable Table 4 Figure 2 LED Status Description 1 PoE Budget 100 Solid green The power...

Страница 5: ...on a DIN Rail Before beginning either mounting or removing the DIS 200G from a DIN rail please ensure that the DIN rail is level and that the DIN rail mounting kit is installed correctly on the DIS 2...

Страница 6: ...he surface where you wish to mount the switch 60 mm apart 7 Drill holes on the marks and insert wall anchors appropriate for the material of the wall 8 Insert screws into the wall anchors leaving roug...

Страница 7: ...ce The DIS 200G can be powered using a power adapter optional or by using the in built terminal connector Thisallowsdualpowerinputs usingwires from the power source s screwed in to the terminal connec...

Страница 8: ...include Microsoft Internet Explorer Firefox Chrome and Safari YouneedthefollowingequipmenttoaccesstheWeb UI of your device A PC with an RJ 45 Ethernet connection A standard Ethernet cable 1 Connect t...

Страница 9: ...tible program The SNMP function is disabled by default and must be enabled on the switch first by using either the Web UI DNA the console or Telnet D View SNMP Network Management System is a comprehen...

Страница 10: ...complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received in...

Страница 11: ...Notes...

Страница 12: ...Notes...

Страница 13: ...Notes...

Страница 14: ...Notes...

Страница 15: ......

Страница 16: ...Ver 1 04 WW _130x183 2020 03 19...

Отзывы: