2
E
N
G
LI
S
H
Notice Before Setup the DGS-1016D / DGS-1024D
The setup of the Switch can be performed using the following steps:
A.
Install the DGS-1016D / DGS-1024D in a fairly cool and dry place. See Technical
Specifications for the acceptable operation temperature and humidity ranges.
B.
Install the Switch in a site free from strong electromagnetic source, vibration, dust, and
direct sunlight.
C.
Leave at least 10cm of space at the left and right hand side of the Switch for ventilation.
D.
Visually inspect the power cable and ensure that it is firmly inserted into a suitable power
outlet.
Installation
Desktop or Shelf Installation
Rack Installation
When installing the Switch on a desktop
or shelf, the rubber feet included with
the device must be first attached. Attach
these cushioning feet on the bottom at
each corner of the device. Allow enough
ventilation space between the device
and the objects around it.
The Switch can be mounted in an EIA standard size,
19-inch rack, which can be placed in a wiring closet
with other equipment. To install, attach the mounting
brackets on the switch’s front panel (one on each side)
and secure them with the screws provided.
Then, use the screws provided with the equipment
rack to mount the Switch in the rack.
DGS-1016D /
DGS-1024D
Quick Installation
Guide
Power Cord
Rack-mount bracket
These are the items included with your DGS-1016D / DGS-1024D purchase:
Check Your Package Contents
Quick Installation Guide
DGS-1016D / DGS-1024D
16 / 24-Port Gigabit Desktop Switch
Содержание DGS-1024D/E1
Страница 24: ...Ver 3 11 DI 2012 03 16 6GS1016DML08G ...