Acceptance test
230 V, 50 Hz
Seperate electric circuit..
Mark fuse.
230 V supply
L
N
PE
BAZ 04-N-UT
Connection of fire detector
Max. 13 fire detectors connectable.
Only D+H approved detectors must be used.
first to penultimate
fire detector
last
fire detector
SD-O 371
or
FD-T 271
BAZ 04-N-UT
Line
1
2
EP
6
EM 2
1
C 3
IN 4
OUT 5
EP
6
EM 2
1
C 3
IN 4
OUT 5
10 k
W
Endwiderstand*
BAZ 04-N-UT
99.824.74 1.4/03/17
16/28
English
* Terminal resistors for
line monitoring
It is pinched in control
panel for transport.
Take it off there and
connect according to plan.
Terminal resistor must
remain at terminal „line“
1,2, when no fire detector
or external control exists!
Protection cap:
Place enclosed protection cap
over supply terminal after mains
cable has been connected.
After the locking system has
been installed completely in
place, it must be subjected to an
acceptance test to ensure that it
has been installed in accordance
with the relevant regulations and
that it is in perfect working order.
The user must arrange for such
acceptance test.
The acceptance test may only be
conducted either by specialist
personnel employed by the
manufacturer of the locking
devices, and authorized by
same, or specialist personnel
from an appropriately nominated
testing authority.
After succesfull acceptance test,
the user must permanently attach
the plate, supplied by the
manufacturer, to the wall
adjacent to the fire door. A
takeover certificate will be issued
to the user, who must ensure,
that it is kept in a safe place.