background image

 

Version 1.0 

Press and hold the reset button on the right panel side of the dosing pump. When the red status 
indicator flashes twice, and the buzzer sounds twice, release the button immediately.  

Wait another 3 seconds. The red status indicator will then start to flash rapidly. The device enters 
configuration mode. 

When the dosing pump is in configuration mode, click "indicator blinking" on the App to start the 
connection. This may take a few moments. 

After the connection is successful, the App will confirm the successful connection and the status light 
on the dosing pump will show solid red. 

At this point the dosing pump is connected to the cloud and the dosing program can be set via the 
app. 

 

Programming the dosing pump 

To Program the dosing pump, open the Kamoer Remote App, and select the device you want to 
program from the available devices list. 

With the device selected the main plan page will be displayed. This shows the four individual pump 
heads and their associated dosing plans. At this stage, as there are no programs set “no plan added” 
will appear under each pump heading.  

When set the volume of available dosing solution will also be displayed here for each pump. 

The default names for the Pump heads are set to Pump 1 – 4 these can be changed to indicate the 
solution they are adding, see the settings chapter in this manual. 

From this page the individual pump heads can also be turned off using the blue toggle associated with 
each pump head. This way the dosing plan can be stopped without having to delete the set plan and 
then restarted, when required, by setting the toggle to on. 

 

 

w

w

w

.th

ea

qu

ari

um

so

lu

tio

n.c

om

 

Содержание H2Ocean P4

Страница 1: ...P4 CLOUD DOSING PUMP USER MANUAL...

Страница 2: ...ter your cloud account 5 Connect your dosing pump to the cloud 6 Programming the dosing pump 7 Setting the dosing plans 8 Advanced plan adjustments 11 Manual Addition 14 Calibration 15 Advanced Settin...

Страница 3: ...resistance and ozone UV resistance Up to 24 dosing plans per day per channel 1 99 day cycle dosing per channel or specified weekly dosing per channel Each channel can be individually calibrated D D P...

Страница 4: ...ture development 8 Power input DC 12V Indicator Status Description Status indicator Red On Connected to the Cloud via router Off Disconnected from the router Fast Flashing Pump is in configuration mod...

Страница 5: ...installation Please note the pump heads on the doser can be removed and rotated to do this press the blue tabs on the side of the head and carefully pull the head away from the pump The head can then...

Страница 6: ...You will need to register an account and login on the Kamoer remote app before using your dosing pump Choose to register via E mail or mobile then follow the onscreen instructions to complete registra...

Страница 7: ...s into two separate 2 4 and 5ghz networks before attempting to connect the pump Connect the power supply to the DC 12v socket on the side of the dosing pump and plug in to a mains power source After t...

Страница 8: ...dosing pump To Program the dosing pump open the Kamoer Remote App and select the device you want to program from the available devices list With the device selected the main plan page will be displaye...

Страница 9: ...dose for a limited period e g between 10 00 and 18 00 Once the times have been set tap Save in the top right corner Select the Quick Add tab Enter the total amount that you would like to dose during t...

Страница 10: ...un as described above but the second channel will start its first dose at 12 03 and then continue with an automatically programmed 3 minutes delay on every dose When finished tap Save in the top right...

Страница 11: ...ump 1 has been set to dose every three days a total of 10ml over 24 smaller doses between 00 00 and 23 59 The dosing container has 999 6ml of solution left in it and should therefore last approximatel...

Страница 12: ...ount as required select Save to confirm the change It is only possible to set a time within the period set for the plan group Plan points will always be displayed in time order If two points are set a...

Страница 13: ...n group period it is best to delete the existing Group plan by swiping the plan to the left and set up a new one as described in this manual Plan points can be added to an existing group by selecting...

Страница 14: ...ted Tap Save to confirm the changes Once saved any existing plan points for that group will be overwritten Multiple plan groups can be added to the same pump This will allow different plans to be set...

Страница 15: ...ices list In the Plan page tap the Manual icon at the bottom middle of the screen This will open the manual settings page Tap on the pump that you would like to set a manual dose for and enter the amo...

Страница 16: ...eriod of time it is worth calibrating pump heads to ensure accuracy To calibrate open the app and select the device you want to calibrate from the available devices list Tap the Settings icon located...

Страница 17: ...dvised Tap on Add start and the pump will run for the time selected in the previous step Once the pump has stopped remove the outlet hose from the measuring cylinder and stand the measuring cylinder o...

Страница 18: ...the settings page will open Select the pump name or the channel name you would like to change enter the new name and tap Save in the top right corner Update firmware If the firmware on the device is...

Страница 19: ...ctory Settings Reset Use this function to factory reset the unit This will remove all programmed settings from the unit To reset the unit tap on Factory Settings Reset and select reset The unit will b...

Страница 20: ...purchase D D The Aquarium Solution Ltd undertakes to repair or at our decision replace the defective part free of charge Our policy is one of continual technical improvement and we reserve the right...

Отзывы: