background image

3. Field Installation Checklist

 The Central unit and access control panel need a common ground.

 The Remote unit and card reader need a common ground.

 The top of each unit (where antennas are located) should point toward the sky.

 The Central and Remote units should be installed level relative to each other.

 There should be a direct line of sight between Central and Remote units (if there is no direct line of sight, 

    a Repeater unit is recommended).

 Both the Central and Remote units should be mounted high enough to avoid interference from obstacles 

    (vehicles, trains, buildings, trees, etc.).

 Metal mounting surfaces are not recommended. If use of a metal surface is unavoidable, space unit as far 

    from metal surface as possible using non-metal spacer. 

 Enclosure locking screws (6-32 x 3/8) max torque rating 8.5 inch-pounds. 

    If troubleshooting is necessary, see manual.

Typical Suprex® RF Central and Remote Wiring Connections

Ground

LED  Out

Data1

Data  0

N.O.

COM

Access
Control

Panel

+8 to +16 VDC

Ground

LED In
Data 1
Data 0

R1 IN

Ground

SPX-56

31 / 5641

 Central

DC Power 

Supply

Power

Ground

+8 to +16 VDC

Ground

LED OUT
Data 1
Data 0

R1 N.O.

R1 COM

R1 N.C.

Card

Reader

Power

Ground

LED IN

Data 1
Data 0

Door 

Strike 

Output

SPX-56

31 / 5641

 Remote

Typical S

 

 Series 

Central and Remote Connections

DC Power 

Supply

Power

Ground

10/26/2020                                           Complete documentation PDFs at CypressIntegration.com

 

Ground

LED  Out

Data1

Data  0

N.O.

COM

Access
Control

Panel

+8 to +16 VDC

Ground

LED In
Data 1
Data 0

R1 IN

Ground

SPX-56

31 / 5641

 Central

DC Power 

Supply

Power

Ground

+8 to +16 VDC

Ground

LED OUT
Data 1
Data 0

R1 N.O.

R1 COM

R1 N.C.

Card

Reader

Power

Ground

LED IN

Data 1
Data 0

Door 

Strike 

Output

SPX-56

31 / 5641

 Remote

Typical S

 

 Series 

Central and Remote Connections

DC Power 

Supply

Power

Ground

Отзывы: