14
CY3273 Cypress Low Voltage Powerline Communication Evaluation Kit Guide, Doc. # 001-55382 Rev. *C
Getting Started
7. When the installation begins, a list of all packages appears on the
Installation Page
.
8. A green check mark appears next to every package that is downloaded and installed.
9. Wait until all the packages are downloaded and installed successfully.
Figure 2-5. Installation Page