9
6.4.3 Network Switch Tray Installation
The Network Switch Tray provides a convenient mounting location for 1U
ancillary equipment such as a network switch or router. After the tray has
been installed any preferred device(s) may be placed on it. Optionally, the
devices may be secured to the side of the tray by using the tray’s side vent
slots.
Note: The method of securing devices to the tray will vary depending on the
design of the individual device.
STEP 1
Flip the rack chassis so that it is upside down and place it on a stable, flat
workspace. Align the Network Switch Tray, with the raised portion towards
the front of the chassis, and the slide it into place. Ensure that all 4 screw
holes on each side align with the screw holes in the chassis.
Note: While this can be done with the chassis right-side-up, the alignment
and attachment process is generally easier while the chassis is upside down.
Содержание CSR-G6400
Страница 1: ...Operation Manual Operation Manual 6U Rack Chassis Black 6U Rack Chassis White CSR G6400 CSR G6400 W ...
Страница 2: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ...CYPRESS TECHNOLOGY CO LTD www cypress com tw ...