Verify proper operation
If machine CANNOT be moved without adding or removing weight stack
Two people will be required for this procedure
1.
Remove the two Button Head Socket Cap Screws (BHSCS) securing the top cap to the frame using a 7/32”
Allen wrench.
Qty.
Description
2
BHSCS
1
1
Top cap
2
1
Shroud
3
2.
Remove top cap and BHSCS.
3.
Lift shroud up and out of machine.
4.
Remove guide rod caps. Guide rod cap contains a compression spring that will fly if grasp is not released
slowly. Slide spring loaded guide rod cap down guide rod until cap is clear of frame. Slowly release grasp of
guide rod cap and remove.
Qty.
Description
2
Guide rod cap
1
2
Compression spring
2
2
Guide rod
3
5.
Remove guide rod cap and springs.
6.
Repeat procedure for opposite guide rods.
Page 11 of 23
Содержание VR1 Overhead Press
Страница 1: ...VR1 Overhead Press Owner s Manual Part Number 13010 999 4 AC ...
Страница 2: ......
Страница 6: ...Label Placement The following diagram shows where each label is located Page 6 of 23 ...
Страница 7: ...Qty Description 1 DE000001 X 1 1 DE000005 X 2 1 4520 362 X 3 Page 7 of 23 ...
Страница 20: ...Qty Description 1 Nut 1 1 Cam bolt adjustment 2 Page 20 of 23 ...
Страница 23: ......