Chapter 4
:
Replacing Components and Preventive Maintenance
98
SE505 Hardware Manual
Conveyor Components
This section contains procedures for replacing the following conveyor components:
●
Conveyor clamp blade
●
Conveyor clamp air fittings
●
Conveyor clamp hall effect switch
●
Conveyor clamp cylinder
●
Conveyor motors
●
Tension pulleys and conveyor belts
●
Board sensors
●
Panel lifter inductive sensor
●
Panel lifter cylinder
Replacing the Conveyor Edge Strip Guides
The conveyor has one edge guide on the front rail and one on the rear rail. Check these strips for
wear and replace as necessary.
Parts
Top Guide
Required Tools
–
No. 3 Allen Key
–
Mallet
–
Driving Tool
–
Wrench size 7 mm
–
Threadlocking sealant
–
Long Nose pliers
➢
To replace the conveyor edge guide
1. Turn off all electrical power to the system. For more information, refer to the section
.
2. Open the hood.
Caution:
Turn the AC main circuit breaker to OFF to shut down all electrical power to the
SE505 unit before replacing any parts or components. For more information, refer to the section
“
Warning:
Make sure the AC main circuit breaker is turned OFF and power is disconnected
from the mains before working inside the hood. Gantry motion can pinch or sever objects in its
path.
i
Note:
For Parts Replacement, contact CyberOptics for part numbers.
i
Note:
This replacement procedure can be performed when the machine is in the production
line.
Caution:
Be careful not to nick or scratch the rail.
Содержание SE505
Страница 1: ...SE505 Hardware Manual ...
Страница 6: ...Contents vi SE505 Hardware Manual ...
Страница 10: ...x SE505 Hardware Manual ...
Страница 11: ...CyberOptics Corporation 1 Safety Safety Guidelines 2 Compliance 7 Safety and Conformity Labeling 8 ...
Страница 72: ...Chapter 3 Installation 62 SE505 Hardware Manual ...
Страница 168: ...Chapter 4 Replacing Components and Preventive Maintenance 158 SE505 Hardware Manual ...
Страница 180: ...Index 170 SE505 Hardware Manual ...