Chapter 3
:
Replacing Components and Preventive Maintenance
56
SE500
ULTRA
Hardware Manual
Maintenance Schedule
Perform the maintenance procedures in this section as specified in the maintenance schedule
below. Perform maintenance more frequently as required, based on machine usage.
Table 10.
Maintenance Schedule
Warning:
To prevent the risk of injury, turn the AC main circuit breaker to OFF to shut down all
electrical power to the SE500
ULTRA
before starting any replacement operations. For more
information, refer to the section “
Maintenance
Monthly
Annually
Page
Every 3 months
Every 3 months
Cleaning Main Electronics Panel
Every 3 months
Cleaning the Air Regulator Filters
Every 3 months
Every 3 months
Every 3 months
Every 3 months
Checking the Emergency Stop Functionality
Once a month
Lubricate the Gantry and Z-Stage
Every 3 months
Replacing the Conveyor Edge Strip Guides
Once a year
Once a year
Every 3 years
Every 3 months
Once a month
Frequency
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...