7 Use
7.1 Putting into service
Putting the machine into service is carried out upon completion of installation operations and in practice consists of the first
start-up.
Follow the procedure below for putting into service:
Make the pneumatic connection (see par. 5.7.2).
Set the air pressure on the pressure regulator to 2 bar.
Make the electrical connection (see par. 5.7.1).
Position the main electrical switch with its indicator light on. (see par. 6.2).
Reset any emergency buttons activated.
Press the RESET button. (see par. 6.6).
Set the laminating speed using the control panel. (see par. 6.3).
Set the various parameters required for processing from the control panel. (see par. 6.3).
7.2 Starting processing
Perform the following operations to start processing after putting the machine into service:
Check that the air pressure on the pressure regulator is set to 2 bar; adjust if it does not correspond.
Check the laminating speed set on the control panel.
Verify that the parameters correspond exactly to the processing that must be performed.
Load the material to be processed into the machine.
7.3 Manual controls
To manage roller rotation manually:
Verify that pedal function is active. (see par. 6.3).
The command is press-and-hold. Keep the pedal pressed until the operation is complete (see par. 6.4).
At this point, the machine is ready to start working or it can be switched off.
To start working, see par. 7.2.
Warning
Remove any equipment, materials or objects used for
installation or other from the machine.
The presence of equipment or parts not belonging to the
machine can cause damage to people or to the machine
itself.
EXPRESS
USE AND MAINTENANCE MANUAL
EN
MANUAL CODE: 771027010
REVISION: 0
DATE: 29/11/2018
FLEXA S.r.l. - Partial or whole reproduction prohibited without authorisation
39
Содержание CWTLAM-160
Страница 2: ......
Страница 59: ......
Страница 60: ...FLEXA Sr l reserves the right to make technical changes to this manual without prior notice...