background image

 

9. Tighten clamp lever. 

10. If oversize or undersize threads are required, set the index  line  in direction of OVER or 

UNDER size mark on size bar. 

 
Threading Operation 

Relevant parts

’ name, please refer to the photos within this manual.

 

1. Install die set. Refer to dies Installation procedure above. 

2. Swing cutter and reamer to UP position. 

3. Swing die head to DOWN position with throwout lever set 

to CLOSE position. 

4. Switch on the threader. Oil should flow from die head. 

5. Turn carriage handwheel to bring dies against end of pipe. 

Exert pressure on handwheel to start dies. 

6. When die head end of pipe contacts trigger, throwout lever 

is automatically opened on tapered threads.

 

7. Switch off power and turn carriage handwheel to back die 

head off. Swing the die head to UP position. 

 

Pipe cutting 

Relevant parts

’ name, please refer to the photos within this manual.

 

1. Swing reamer and die head to UP position. 

2. Move pipe cutter DOWN onto pipe and move carriage with 

handwheel to line up cutter wheel with mark on pipe. 

3.  Tighten  cutter  feed  screw  handle  on  pipe  keeping  wheel 

aligned with the pipe. 

4

. Grasp the pipe cutter’s feedscrew handle with both hands 

(Figure 4). 

5. Switch on the machine. 

6. Tighten the feedscrew handle slowly and continuously until 

the pipe is cut. Do not force the cutter into the pipe. 

7. Switch off the machine. Swing pipe cutter back to the UP 

position. 

 

 

Pipe Reaming 

Relevant  parts

’  name,  please refer to  the  photos  within  this 

manual.

 

1. Move reamer arm into DOWN position. 

2.  Switch  on  the  machine.  Advance  reamer  into  pipe  and 

complete  reaming  by  exerting  pressure  on  handwheel 

(Figure 5). 

NOTE! Do not apply excessive pressure on handwheel. 

Fig 5

 

Fig 3

 

Fig 4

 

 

 

 

Содержание SQ50E

Страница 1: ...Machine MODEL SQ50E WARNING Read this Operator s Manual carefully before using this tool Failure to understand and follow the contents of this manual may result in electrical shock fire and or serious...

Страница 2: ...ol should electrically malfunction or break down grounding provides a low resistance path to carry electricity away from the user Avoid body contact with grounded surfaces There is an increased risk o...

Страница 3: ...e for one tool may become hazardous when used on another tool Keep handles dry and clean free from oil and grease Allows for better control of the tool Machine Safety Secure machine to bench or stand...

Страница 4: ...placeable Jaw Inserts Rear Centering Device Cam Action Rotates with Chuck Operating Speed 38 RPM Motor Type Universal type Power 1500 Watts Volts 115V 230V Single Phase AC 50Hz 60 Hz Controls ON OFF S...

Страница 5: ...f the Threading Machine This action hammers the jaws tightly around the pipe Installing dies in die head Relevant parts name please refer to the photos within this manual 1 Place Self Opening Die Head...

Страница 6: ...e head off Swing the die head to UP position Pipe cutting Relevant parts name please refer to the photos within this manual 1 Swing reamer and die head to UP position 2 Move pipe cutter DOWN onto pipe...

Страница 7: ...erforming maintenance or making any adjustment Jaw Inserts 1 Clean teeth of jaw inserts daily with wire brush 2 Replace jaw inserts when teeth become worn and fail to hold pipe or rod NOTE Replace ent...

Отзывы: