CUSHCRAFT MA5B Скачать руководство пользователя страница 2

Your Cushcraft MA5B Yagi is designed and manufactured to give trouble free service.  This antenna will perform as specified if the instructions
and suggestions in this manual are followed and care is used in the assembly and installation.  When checking the components received in
your antenna package use the parts listed beside each diagram.  There is a master parts list on page 2.  If you are unable to locate any tube
or component, check the inside of all tubing.  IMPORTANT: Save the weight label from the outside of the carton.  Each antenna is weighed at
the factory to verify the parts count.  If you claim a missing part, you will be asked for the weight verification label.

PLANNING

Plan your installation carefully.  If you use volunteer helpers be sure that they are qualified to assist you.   Make certain that everyone involved
understands that you are the boss and that they must follow your instructions.  If you have any doubts at all, employ a professional antenna
installation company to install your antenna.

LOCATION

Location of the antenna is very important.  Surrounding objects such as trees, power lines, other antennas, etc. will seriously reduce efficiency.
To minimize the effects of surrounding objects, mount the antenna as high and in the clear as possible.  If metal guy wires are used, they should
be broken with strain insulators.  EXTREME CARE MUST BE USED FOR YOUR SAFETY.  YOU MUST INSURE THAT WHILE THE MA5B IS
IN OPERATION NEITHER PEOPLE OR PETS CAN COME IN CONTACT WITH ANY PORTION OF YOUR ANTENNA.  DEADLY VOLTAGES
AND CURRENTS MAY EXIST.  ALSO, SINCE THE EFFECTS OF EXPOSURE TO RF FIELDS ARE NOT FULLY UNDERSTOOD, LONG
TERM EXPOSURE TO INTENSE RF FIELDS IS NOT RECOMMENDED.  THERE IS A WARNING STICKER WHICH MUST BE ATTACHED
TO THE BOOM AS SHOWN IN FIGURE I.

MOUNTING

The mast mount bracket will accommodate up to a 2" (5.1 cm) mast.  A 1-1/2" OD (3.8 cm) or larger heavy wall tubing mast should be used.  A
good heavy duty antenna rotator will provide the best service and longest life.  Often it is desirable to mount several antennas on one mast.
To keep possible interaction to a minimum, place your antennas as far apart as you can.

SYSTEM GROUNDING

Direct grounding of the antenna, mast and tower is very important.  This serves as protection from lightning strikes and static buildup, and from
high voltage which is present in the radio equipment connected to the antenna.  A good electrical connection should be made to one or more
ground rods (or other extensive ground system) directly at the base of the tower or mast, using at least #10AWG ground wire and noncorrosive
hardware.  For details and safety standards, consult the National Electrical Code.  You should also use a coaxial lightning arrester.  Cushcraft
offers several different models, such as LAC-1, LAC-2 and the LAC-4 series.

ASSEMBLY

Assemble your antenna by following the directions and illustrations in steps 1 through  6.  After the antenna is completely assembled, verify
dimensions and element spacings for accuracy.  Then, return to the section below for final tuning.

TUNING PROCEDURE

Set the element lengths for the portion of the band you want to operate on using Chart A and Figure 2.  Your MA5B is now ready for use.

You may check the VSWR in order to confirm assembly was done properly.  The easiest place to check the antenna is likely to be in its final
mounting configuration.  Orient the antenna such that it is pointing straight up.  The back of the antenna should be at least 2 feet (.6 m) off the
ground.

Run the coax cable from your transmitter to the area in which the antenna is to be tested.  The length of this cable or your feedline is not critical.
Connect a good quality VSWR bridge to the end of this cable.  Connect a short length of cable [10 ft. (305 cm) or less] from the VSWR bridge
to the antenna under test.  Set the transmitter to your center operating frequency and measure the VSWR while taking care not to effect the
measurement with your body.  A VSWR of 2:1 or less is satisfactory and will not degrade the performance.  If the VSWR is greater than 2:1,
check all dimensions and connectors.

WARNING

THIS ANTENNA IS AN ELECTRICAL CONDUCTOR.  CONTACT WITH POWER LINES CAN RESULT IN DEATH, OR SERIOUS
INJURY.  DO NOT INSTALL THIS ANTENNA WHERE THERE IS ANY POSSIBILITY OF CONTACT WITH OR HIGH VOLTAGE ARC-
OVER FROM POWER CABLES OR SERVICE DROPS TO BUILDINGS.  THE ANTENNA, SUPPORTING MAST AND/OR TOWER
MUST NOT BE CLOSE TO ANY POWER LINES DURING INSTALLATION, REMOVAL OR IN THE EVENT PART OF THE SYSTEM
SHOULD ACCIDENTALLY FALL.  FOLLOW THE GUIDELINES FOR ANTENNA INSTALLATIONS RECOMMENDED BY THE U.S.
CONSUMER PRODUCT SAFETY COMMISSION AND LISTED IN THE ENCLOSED PAMPHLET.

MA5B

Page 1

Содержание MA5B

Страница 1: ...951485 5 99 MA5B 20 17 15 12 10 Meter Beam Antenna ASSEMBLY AND INSTALLATION INSTRUCTIONS ...

Страница 2: ...serves as protection from lightning strikes and static buildup and from high voltage which is present in the radio equipment connected to the antenna A good electrical connection should be made to one or more ground rods or other extensive ground system directly at the base of the tower or mast using at least 10AWG ground wire and noncorrosive hardware For details and safety standards consult the ...

Страница 3: ...E WRAP 4 404 010404 5 16 18 x 2 7 16 SS U BOLT 2 403 010403 5 16 18 x 1 955 SS U BOLT 2 70 190070 BOOM TO MAST PLATE 1 19 010119 5 16 SS SPLIT LOCK WASHER 8 18 010118 5 16 18 SS HEX NUT 8 X41 XHR41 41 X HAT ROD 12 X26 XHR26 26 X HAT ROD 8 28 190028 HALF WASHER 20 26 190026 ELEMENT BRACKET 20 85 010085 1 4 20 SS HEX NUT 6 84 010084 1 4 SS SPLIT LOCK WASHER 6 33 190033 U BOLT BACKING PLATE 3 143 190...

Страница 4: ...e U bolts 403 lock washers 19 and hex nuts 18 Apply the danger label 326 to the boom near the mast plate KEY P N DISPLAY DESC SIZE QTY 18 010118 SS Hex Nut 5 16 18 4 19 010119 SS Lock Washer 5 16 4 46 050046 Plastic Cap 1 1 2 3 8 cm 2 70 190070 Boom To Mast 6 x 3 1 2 1 Plate 15 2 x 8 9 cm 403 010403 U Bolt 5 16 x 2 2 5 1 cm 413 030413 Worm Clamp 1 3 4 2 4 4 cm BA MA5BBA Aluminum Tube 1 1 2 x 44 2 ...

Страница 5: ...with the arrows pointing toward elements EE Adjust the total length of the assembly to 205 5 inches 522 cm Place the plastic endcaps 61 over the ends of elements EE To assemble element 3 place worm clamps 411 over the ends of element EF Place worm clamps 410 over the slotted ends of elements EB and EC Insert elements EB into elements EF to a 4 inch insert length Tighten the worm clamps Insert the ...

Страница 6: ...12 7 cm B B 410 410 410 410 410 410 EB EB 410 410 ED EA ED EA EE 411 411 411 411 ELEMENT ASSEMBLY Cont 31 41 11 2 PLACES 2 PLACES 2 PLACES FIGURE 2A FIGURE 2B I M P O R T A N T All traps must be mounted with holes facing down for drainage 98 2 PLACES FREQUENCY DIM A DIM B 14 025 MHz 9 22 9 cm 9 22 9 cm 14 175 MHz 8 20 3 cm 8 20 3 cm 14 300 MHz 7 17 8 cm 7 17 8 cm TUNING CHART A 205 5 522 cm EC EB ...

Страница 7: ...S 2 PLACES 2 PLACES 2 PLACES X26 11 41 31 28 26 2 PLACES 2 PLACES 2 PLACES 2 PLACES 2 PLACES 2 PLACES FIGURE 3A FIGURE 3B SEE FIGURE 3B SEE FIGURE 3A SEE FIGURE 3B SEE FIGURE 3A SEE FIGURE 3B KEY P N DISPLAY DESC SIZE QTY 11 010011 SS HEX NUT 8 32 20 26 190026 ELEMENT 7 8 x 7 8 20 BRACKET 2 2 x 2 2 cm 28 190028 HALF 1 1 8 x 3 8 20 WASHER 2 9 x 1 cm 31 010231 SS SCREW 8 32 x 1 3 4 20 3 81 cm 41 011...

Страница 8: ...402 element to boom clamp 143 backing plate 33 lock washers 84 and hex nuts 85 fasten the element to the boom Note that the exposed threads on the element screws item 31 from section 2 should be facing away from the boom Attach element 3 to the boom at a distance of 55 inches 139 7 cm from element 2 Using the U bolt 402 element to boom clamp 143 backing plate 33 lock washers 84 and hex nuts 85 fas...

Страница 9: ...143 Boom 84 85 Element 1 33 2 PLACES 2 PLACES 402 143 Boom 84 85 Element 3 33 2 PLACES 2 PLACES 402 143 Boom 85 33 2 PLACES 2 PLACES 84 Element 2 Boom 4 ELEMENT MOUNTING Cont FIGURE 4A FIGURE 4B FIGURE 4C Page 8 ...

Страница 10: ... on the right side Attach the wires using lock washers 41 and hex nuts 11 Slide the matching network to prevent over stressing the cables and tighten the worm clamps Attach cable ties 342 in 4 places around the cables and tighten 2 PLACES 2 PLACES 11 41 2 PLACES 11 41 ELEMENT 1 ELEMENT 2 When attaching feedlines to the elements the black wires must be attached to the same sides I M P O R T A N T 2...

Страница 11: ...of the matching network RF connector and tighten the cable to the matching network Do not apply silicone to the center conductor or dielectric of either connector Slide the boot over the connector Place the coaxial cable over the top of element 2 on the boom and run the cable down the mast to the radio equipment KEY P N DISPLAY DESC SIZE QTY 18 010118 HEX NUT 5 16 4 19 010119 LOCK WASHER 5 16 4 11...

Страница 12: ...ty is in lieu of all other expressed warranties any implied warranty is limited in duration to one year Cushcraft Corporation shall not be liable for any incidental or consequential damages which may result from a defect Some states do not allow limitations on how long an implied warranty lasts or exclusions or limitations of incidental or consequential damages so the above limitation and exclusio...

Отзывы: