
INSTALLATION INSTRUCTIONS
II1
19 If the UCM is not already lit, push the ON/OFF button
POUIF6$.8IFOUIFXBUFSMFWFMJOUIFUBOLSJTFT
to the correct volume, the heating elements will turn
on automatically. Depending on the incoming water
UFNQFSBUVSFBOEUIFFMFDUSJDBMTQFDJmDBUJPOTUIF
water tank typically requires 20 to 30 minutes to
SFBDIUIFGBDUPSZTFUPQFSBUJOHUFNQFSBUVSF8IFO
the water has heated, “Ready to Brew” should be on
the display.
20
#FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFPVODFT
of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
21 Brew a cycle of at least 12 ounces, to purge any
remaining air from the tubing. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
((&.*/45"--"5*0/*/4536$5*0/4ø
120817B
Содержание GEMSS10A1000
Страница 27: ...ELECTRICAL SCHEMATICS ES31 GTPS 10 ELECTRICAL SCHEMATIC 061918B SINGLE DOMESTIC 220 VOLT...
Страница 30: ...ELECTRICAL SCHEMATICS ES34 515 53 4 5 TWIN DOMESTIC...
Страница 31: ...TWIN 3 PHASE WITH TRANSFORMER ELECTRICAL SCHEMATICS ES35 515 53 4 5...
Страница 32: ...TWIN 3 PHASE WITHOUT TRANSFORMER ELECTRICAL SCHEMATICS ES36 515 53 4 5...
Страница 33: ...TWIN EXPORT ELECTRICAL SCHEMATICS ES37 515 53 4 5...