![Curtis GEM-12D Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/curtis/gem-12d/gem-12d_installation-instructions-service-and-warranty-information_2699463004.webp)
4
Your Curtis ADS System is Factory Pre-Set and Ready to Go…
Right from the Carton.
Following are the Factory Settings for your GEMINI
®
Coffee Brewing System:
• Brew Temperature = 200°F
• Brew Volume = Set to dispensing vessel requirements (36 - 5 oz. Cups)
• Water Bypass = ON
• Sleep Mode = OFF
Generally there will never be a reason to change your ADS programming. However, should you need to
make slight adjustments to meet your brewing needs, programming instructions are
provided later in this manual.
SYSTEM REQUIREMENTS
• Water Source
20 – 100PSI (Minimum Flow Rate of 1 GPM)
CAUTION: DO NOT connect this brewer to hot water. The inlet valve is not rated for hot water.
• Electrical
See attached schematic for your model
This equipment is to be installed to comply with the applicable federal, state, or local plumbing and
electrical codes having jurisdiction.
SETUP STEPS
The unit should be level (left to right and front to back), located on a solid counter top. Connect a water
line from the water filter to the brewer. NOTE: Some type of water filtration device must be used to main-
tain a trouble-free operation. (In areas with extremely hard water, we suggest that a sedimentary and
taste & odor filter be installed.) This will prolong the life of your brewing system and enhance coffee qual-
ity. The top back panel of the brewer has two 8-32 x 3/8” screws to
facilitate mounting the filter.
The National Sanitation Foundation requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be
moved for cleaning underneath.
2. In some areas an approved backflow prevention device may be required between the brewer and the water
supply. (Check local plumbing codes)
1. A 3/8” NPT x 3/8” compression elbow has been supplied for water line connection. Use
tubing sized sufficiently to provide a minimum of 1.0 GPM.
2. Connect the unit to an appropriate electrical power circuit.
3. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to
fill. When the water level in the tank rises to the correct volume, the heating elements
will energize automatically. With ADS Systems there is no danger of element burnout
caused by an empty tank.
4. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F)
as indicated by the READY-TO-BREW indicator.
5. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
6. Run brew cycles of at least 12 ounces, per brew head, to purge the water lines of any
air that may be trapped after filling.
QUICK START &
SET-UP
WARNING: To avoid
electrical shock this
brewing system must
be properly ground-
ed.
IMPORTANT: Your
ADS System is
“PLUG and BREW”
Ready. There is no
need to manually
fill the water tank or
change the factory
program.
Содержание GEM-12D
Страница 14: ...14 ELECTRICAL SCHEMATICS...
Страница 15: ...15 ELECTRICAL SCHEMATICS...
Страница 19: ...19...