INSTALLATION INSTRUCTIONS
II11
(5)&3.0130.*-"/0*/45"--"5*0/*/4536$5*0/4ø
092519E
Powering up the Unit (cont.)
16
8IFOUIFXBUFSMFWFMJOUIFUBOLSJTFTUPUIFDPSSFDU
volume, the heating elements will turn on automatically.
Depending on the incoming water temperature and
UIFFMFDUSJDBMTQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZ
requires 20 to 30 minutes to reach the factory set
PQFSBUJOHUFNQFSBUVSF8IFOUIFXBUFSIBTIFBUFE
“Ready to Brew” should be on the display.
17
#FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFP[
ml of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
18 Brew a cycle of at least 12 oz./350 ml, to purge any
remaining air from the tubing. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
IMPORTANT:
8IFOPQFSBUJOHUIFVOJUBUIJHIFS
elevations, reduce the default operating
temperature (200°F/92°C) by 2°F/1°C for each
1000 feet (300 m) of elevation above 4000 feet
(1200 m). See
PROGRAMMING GUIDE
.
Содержание G3 ThermoPro Series
Страница 30: ...ELECTRICAL SCHEMATICS ES31 GTPS 10 ELECTRICAL SCHEMATIC 061918B SINGLE DOMESTIC 220 VOLT...
Страница 33: ...ELECTRICAL SCHEMATICS ES34 515 53 4 5 TWIN DOMESTIC...
Страница 34: ...TWIN 3 PHASE WITH TRANSFORMER ELECTRICAL SCHEMATICS ES35 515 53 4 5...
Страница 35: ...TWIN 3 PHASE WITHOUT TRANSFORMER ELECTRICAL SCHEMATICS ES36 515 53 4 5...