
14
S
ection
4 — A
SSembly
& i
nStAllAtion
8.
Install the upper chute tube over the chute tube extension,
as shown in Figure 4-22.
Figure 4-22
9.
Secure the upper chute tube to the lower discharge chute
by stretching the rubber strap on the upper chute tube
downward and hooking it onto the pin on the lower chute
tube. See Figure 4-23.
Figure 4-23
10. With the bagger cover open, install the upper chute over
the chute adapter, and rest the top so that the chute
support sits in the upper chute groove. See Figure 4-24.
Note:
Make sure to align the upper chute with the ridges
on the bagger support bracket, as shown in the inset of
Figure 4-24.
Figure 4-24
Содержание 19A70040100
Страница 18: ...Notes 7 18...
Страница 19: ...19 Section 7 Notes...