C T I 2552 Installation and O peration G uide
7
CHAPTER 2. INSTALLATION
The installation of the 2552 Eight Channel RTD Input Module involves the following steps:
1. Planning the installation
2. Configuring the module
3. Inserting the module into the I/O base
4. Wiring the module input connector
5. Checking module operation
The steps listed above are explained in detail in the following pages.
2.1 Planning the Installation
Planning is the first step in the installation of the module. This involves calculating the I/O base power
budget and routing the input signal wiring to minimize noise. The following sections discuss these
important considerations.
2.2 Calculating the I/O Base Power Budget
The Model 2552 requires 2.8 watts of +5 V power from the I/O base. Use this figure to verify that the
base power supply capacity is not exceeded.
2.3 Unpacking the Module
Open the shipping carton and remove the special anti-static bag which contains the module.
Содержание 062-00108
Страница 4: ...iv CTI 2552 Installation and Operation Guide ...
Страница 6: ...vi CTI 2552 Installation and Operation Guide ...
Страница 8: ...viii CTI 2552 Installation and Operation Guide ...
Страница 10: ...x CTI 2552 Installation and Operation Guide ...
Страница 13: ...CTI 2552 Installation and Operation Guide 3 Figure 3 Example Change Input Level ...
Страница 16: ...6 CTI 2552 Installation and Operation Guide ...
Страница 24: ...14 CTI 2552 Installation and Operation Guide CAUTION RTD wires must be of the same gauge ...
Страница 28: ...18 CTI 2552 Installation and Operation Guide ...
Страница 30: ...20 CTI 2552 Installation and Operation Guide ...
Страница 34: ...24 CTI 2552 Installation and Operation Guide USER NOTES ...
Страница 36: ...26 CTI 2552 Installation and Operation Guide ...