CTEK CGC100 Скачать руководство пользователя страница 4

 

CGC100 MANUAL

 

 

 

 

CTEK E-Mobility 

www.ctekemobility.com 

Page 

4 (8) 

 

1  General information 

The CHARGESTORM® Connected Grid 
Central (CGC100) is a load monitor for electric 
vehicle charging stations. It can also monitor 
other loads at the property during load 
balancing. The CGC100 can act as an internet 
gateway to Charge Portal, CHARGESTORM® 
Connected cloud-based charging portal. 

The CGC100 can manage up to 100 loading 
outlets. 

The CGC100 communicates with charging 
stations using an Ethernet connection.  

1.1 

Purpose 

This document explains how to perform 
installation and commissioning and how the 
product works. 

1.2 

References 

ID    Document 

1)  Configuration manual CCU, PD_CM_003 
2)  CHARGESTORM® Connected User 

Manual, Pd_UM_00050.5 

3)  CCU NanoGrid Configuration Manual, 

Pd_CM_004 

2  Before installation 

2.1 

Tools 

Recommended tools for installation. 

 

Screwdriver  

 

Stripping pliers 

 

Spirit level 

 

Drill 

 

Mini USB cable  

2.2 

Material/ equipment 

The following materials are also needed to 
install the CGC100. 

 

CHARGESTORM® Connected or the 
CSR100 to be load balanced by the 
CGC100 load monitor 
 

 

 

 

Ethernet switch 

 

Ethernet cables 

 

Screw joints for cable feeds 

 

Screw for wall mounting 
 

 

2.3 

Details 

CGC100 contains the following components: 

 

Energy meter Carlo Gavazzi, model 
EM21, with current transformers 

  

 

Control board, CCU 

 

Power supply CCU 

 

Fuse 10A  

 

Terminal block for 230VAC 

 

Triangular key for door. 

All the components are mounted on your DIN 
rail. 

2.4 

Dimensions 

The CGC100 has the following external 
dimensions in mm. 

Model 

Height 

Width 

Depth 

CGC100 

280 
mm 

600 mm 

450 mm 

 

Note: it is important to check that the enclosure 
door can be opened at the installation site. 

2.5 

Installation site 

Note the following: 

 

Run the incoming cables (electrical, 
Ethernet, transformer cables) through 

Содержание CGC100

Страница 1: ...CGC MANUAL Document time Pd_IM_0006 Issue A 1 CTEK E Mobility www ctekemobility com Page 1 8 CGC100 Installation manual...

Страница 2: ...the product has been used in accordance with the manufacturer s instructions Manual This manual is as accurate and up to date as possible at the time of issue However some information may have been u...

Страница 3: ...n 5 2 7 Cable installation 5 2 7 1 General information 5 2 7 2 Cable installation Ethernet 5 2 7 3 Current transformers 5 2 7 4 Cable installation power 6 3 Installation 6 3 1 Step by step 6 3 2 Optio...

Страница 4: ...e installation 2 1 Tools Recommended tools for installation Screwdriver Stripping pliers Spirit level Drill Mini USB cable 2 2 Material equipment The following materials are also needed to install the...

Страница 5: ...eed to be connected the Ethernet cables should be Cat5 or Cat6 cables with an RJ45 connector at each end You will need one cable between each charging box and switch For instance if there are eight ch...

Страница 6: ...in advance c Install the sub unit CGC100 and connect the cables 3 Connect the power a Check the installation before switching on the power to prevent the risk of short circuiting b After the power is...

Страница 7: ...ternet It can be connected either via 3G or Ethernet The way in which the load monitor connects to the internet and contacts the portal is described in reference 1 The login details for the portal mus...

Страница 8: ...ng tests on all the charging stations if no other test instructions are available To do this you need access to a chargeable vehicle or to a CHARGESTORM Connected test box that can simulate charging 5...

Отзывы: