background image

 

MNX10023 / Rev C 

          

                              

4-11-08  

 
 
Section I 
Overview 

Introduction.................................................................................….… 2 
Description.......................................................................................... 2 
ViPR Model Selection......................................................................... 2 
 

Section II 
Installation 

Installation……………………………………………..…..........……...… 3 
Configuring Relays............................................................................. 4 
Analog Output..................................................................................... 5 

 

Section III 
Operation 

Operating Procedure.......................................................................... 4 

 

Section IV 
Maintenance 

General............................................................................................... 6 
Warranty........................................................................................... 10 

 

Figures 

Figure 1 (VP Series Selection Guide)…............................................. 2 
Figure 2 (Cable Entry/Exit & Power)…………….…….........….……… 3 
Figure 3 (Panel Cover)……….….……………………..........…….……. 6 
Figure 4 (Wiring Diagram)……….….……………….......…....…..……. 7 
Figure 5 (Main Panel)……….….…………………….............…..…….. 7 
Figure 6 (Signal Conditioners)……….….…………….........………….. 8 
Figure 7 (Connector Block Removal)…………………..….......………. 8 
Figure 8 (Block Connections)…………………………….........……….. 9 

 
 
 
 
 
 
 
 
 
 

Contents 

Содержание PRO VPR100 Series

Страница 1: ...Product Manual MNX10023 REV C MODEL VPR100 Series ViPR Multi Channel Monitoring System Delta 3N Kft 7030 Paks Jedlik Á u 2 Tel 36 75 510 115 Fax 36 75 510 114 drnagyi delta3n hu www delta3n hu ...

Страница 2: ...Analog Output 5 Section III Operation Operating Procedure 4 Section IV Maintenance General 6 Warranty 10 Figures Figure 1 VP Series Selection Guide 2 Figure 2 Cable Entry Exit Power 3 Figure 3 Panel Cover 6 Figure 4 Wiring Diagram 7 Figure 5 Main Panel 7 Figure 6 Signal Conditioners 8 Figure 7 Connector Block Removal 8 Figure 8 Block Connections 9 Contents ...

Страница 3: ...nd actuates relays based on alert and alarm set points The system will indicate the instantaneous vibration levels and relay status at each channel through the display meters A 4 20mA signal analogous to the percent of full scale vibration based on the internal transmitters is provided as an output for external DCS interfacing The system also supplies outputs for Dynamic Vibration data Waveforms t...

Страница 4: ...ls on the far right side of the enclosure A Conduit Fitting is provided for AC power entry Figure 2 NOTE If there is no sensor wired to the sensor input terminal the corresponding transmitter for that channel will not power on This will cause the Output Display to read low or negative values Be sure to power the system on AFTER the sensor has been connected NOTE If the display fails to output a va...

Страница 5: ...pecific vibration range in IPS mm s or g s To configure the relay set points this range must be known It is recommended that baseline and typical alarm values of vibration are also known before setup is attempted The relays provided by the internal controller are highly configurable Refer to PD765 User Manual for detailed programming instructions All of the following parameters can be adjusted Rel...

Страница 6: ...ration are specified as 0 35 IPS pk and 0 65 IPS pk respectively reset points are specified as 0 30 IPS pk and 0 60 IPS pk Using the provided PD765 Process Controller Manual Select relay operation and action desired for this example we will have LOC Latching Operation with Clear relays Then program Set 1 as 0 35 and Set 2 as 0 65 then program reset points rST 1 as 0 30 and rST 2 as 0 60 After rela...

Страница 7: ... burns or smoke inside the enclosure Enclosure hinges are free from rust and securely latched No moisture or condensation build up inside the enclosure Enclosure viewing window is clean and internal components are clearly visible This worksheet illustrates the method of removing the Main Display Panel to access the SC200 series signal conditioners Section IV Maintenance 1 Start by removing the low...

Страница 8: ...panel suspended by the tether cables and the location of the wiring diagrams 3 After the Screw Terminal panel has been removed the Main Panel needs to come out Start by removing the 4 Phillips head screws holding the main panel Figure 4 Wiring Diagram Figure 5 Main Panel ...

Страница 9: ...opped down and suspended by the tether cables the SC200 series signal conditioners are now accessible 5 Using a Flat Blade screwdriver remove the lower connector block from the main unit Figure 6 Signal Conditioners Figure 7 Connector Block Removal ...

Страница 10: ...duct was not subjected to misuse natural disasters improper installation or modification which caused the defect CONTACT INFORMATION Connection Technology Center Inc CTC 7939 Rae Blvd Victor NY 14564 1 800 999 5290 US Canada 1 585 924 5900 International sales ctconline com www ctconline com The block should have the Numbers 1 4on it shown right For the Dynamic output connect the wires to Terminals...

Отзывы: