CTC Union ITP-500 Скачать руководство пользователя страница 8

 

Panels 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Index No. 

Description 

Wall mounting holes 

Grounding 

Power port label 

Power input port 

Power LED 

M12 Ethernet ports 

Ethernet port LED 

Ethernet port label 

Two Bypass ports (ITP-800 only) 

10 

Power port pin assignment table 

11 

Ethernet port pin assignment table 

12 

Compliant standards  

Table 1: Panel Reference Table 

 

Figure 1: ITP-500 
Front Panel 

Figure 2: ITP-800 
Front Panel 

Figure 3: 
ITP-500 
Side Panel 

Figure 4:  
ITP-800 
Side Panel 

12 

  

  

  

  

  

  

  

  

  

  

  

  

  

12 

  

11 

  

10 

Содержание ITP-500

Страница 1: ...1 Quick Installation Guide sales ctcu com ITP 500 E ITP 800 E IP56 5 x 10 100Base M12 Hardened IP56 8 x 10 100Base M12 Hardened...

Страница 2: ...heir respective owners Technical information in this document is subject to change without notice CTC Union Technologies Co Ltd Far Eastern Vienna Technology Center Neihu Technology Park 8F No 60 Zhou...

Страница 3: ...application the Buyer shall indemnify and hold CTC Union Technologies and its officers employees subsidiaries affiliates and distributors harmless against all claims costs damages expenses and reason...

Страница 4: ...CHANICAL 6 ENVIRONMENTAL 7 CERTIFICATIONS 7 MTBF MIL HDBK 217 7 Panels 8 PIN Assignment 9 M12 ETHERNET CABLE 9 M12 POWER INPUT CABLE 9 M12 Cable Connector Installation 10 Bypass Relay Function for ITP...

Страница 5: ...with EN 50155 standard that covers strict demands on operating temperature power input voltage surge ESD vibration and shock thus making these switches suitable for industrial applications such as veh...

Страница 6: ...8 100 ohm 100m Power Connector Type 5 Pin Male A Code M12 Power Supply ITP 500 E DC 12 24 48V 8 4 60VDC input power ITP 800 E Redundant Dual DC 12 24 48V 8 4 60VDC input power Support Power Input Reve...

Страница 7: ...for Heavy Industrial Environment EN61000 6 4 EMS Electromagnetic Susceptibility Protection Level EN61000 4 2 ESD Level 3 Criteria B EN61000 4 3 RS Level 3 Criteria A EN61000 4 4 Burst Level 3 Criteri...

Страница 8: ...net port LED 8 Ethernet port label 9 Two Bypass ports ITP 800 only 10 Power port pin assignment table 11 Ethernet port pin assignment table 12 Compliant standards Table 1 Panel Reference Table Figure...

Страница 9: ...tive 2 Blue N C No Connection V2 Power Supply 2 Positive 3 Red V Power Supply Negative V1 Power Supply 1 Negative 4 Orange N C No Connection V2 Power Supply 2 Negative 5 Yellow Grounding Grounding Mal...

Страница 10: ...t the screw nut O ring and housing into the cable in the order shown in Figure 2 and keep them loose in this step Step 2 Strip the cable and the individual cores to fit the connector Insert the stripp...

Страница 11: ...11 Step 3 Tighten the connector in clockwise direction making sure that the wires inside the connector are not twisted as the screwed housing is assembled Figure 9 Tighten the Connector...

Страница 12: ...hen power failure occurs in one of the switches bypass relay function can activate bypassing mechanism by interconnecting internal circuits automatically to ensure that links between switches operate...

Страница 13: ...steps below to install ground wire Step 1 Prepare one suitable ground screw and one grounding cable Step 2 Attach the grounding screw to the ring terminal of the grounding cable Make sure that the gr...

Страница 14: ...le and easy and only requires to prepare two appropriate wall screws for mounting the Ethernet Switch After you find a suitable place to wall mount the Ethernet Switch remember to align the mounting h...

Страница 15: ...15 Application Figure 12 On board Train Application Diagram NOTES...

Страница 16: ...16 Version Date Description 1 4 2020 3 31 Use new document format Revise spec...

Отзывы: