background image

Providing sustainable energy solutions worldwide

Installation- and maintenance instructions

CTC EcoZenith 

C 530 / 510

161 505 77-1  2014-01-16

Содержание EcoZenith 510

Страница 1: ...Providing sustainable energy solutions worldwide Installation and maintenance instructions CTC EcoZenith C 530 510 161 505 77 1 2014 01 16...

Страница 2: ......

Страница 3: ...Installation and maintenance instructions CTC EcoZenith C 530 510 161 505 77 1 2014 01 16...

Страница 4: ...enith C 530 design______________________________ 8 3 CTC EcoZenith 510 design__________________________________ 9 4 Operation and maintenance______________________________ 10 4 1 Safety valve for the...

Страница 5: ...is a buffer tank with a volume of just over 500 litres and has among other features inbuilt solar and hot water coils for use for example as the first tank in a wood boiler system CTC EcoZenith 510 i...

Страница 6: ...round it for fitting the insulation and plastic top See section Transport unpacking and installation in the section for the installation technician CTC EcoZenith C 530 and 510 should also not be place...

Страница 7: ...of about 40 metres of finned copper coil for heating water This pre heats the water through the lower tank and then passes through the upper tank for the final temperature increase There are two coils...

Страница 8: ...mperature water in the lower part for the best heat exchange of solar heat Lower tank connections A heat pump and solar coil can be connected to the lower part of the tank Water to be heated by a wood...

Страница 9: ...er CTC EcoZenith 510 is prepared with fitting for immersion heater Immersion heaters are accessories Insulation The tank is insulated with 90 mm thick moulded polyurethane foam to minimise heat loss T...

Страница 10: ...ockwise Air must be applied to a closed system 4 3 Operation stop If there is a risk of the water freezing when the system is not in use all the water must be drained from the tank and radiator system...

Страница 11: ...he functions and settings with the property owner and answer any questions Both CTC EcoZenith C 530 510 and you will benefit by the user having good knowledge of how the application works and should b...

Страница 12: ...e connection sleeve Cover plates for upper and lower tank connections 8pcs Cover plates for solar connections 2pcs Insulation for connection sleeves that are not used Screw 4 2 x 14 graphite grey 25 o...

Страница 13: ...and they are easier to fit if there is space around the unit Begin with the left rear insulation Turn out the insulation locate it in the pockets in the front insulation and then turn it in against th...

Страница 14: ...The illustration shows EcoZenith I 550 Zinc grey screw 4 off Fit the plastic top at the front and tip it backwards to locate it under the mixing valve actuator Fit the 4 provided zinc grey screws in t...

Страница 15: ...tter freezing risk must be avoided and it must be open pressureless Radiator system filling valve Fit the filling valve between the cold water connection and the radiator return pipe or between the co...

Страница 16: ...6 x 935 x 1700 Weight kg 239 134 Insulation Polyurethane PUR mm 90 Hot water capacity 40 C 22 l min 600 523 Tank temp 55 C HP EA125 permitted Tank temp 65 55 C electrical power 24 kW permitted litre l...

Страница 17: ...water 22 mm 7 Hot water circulation 22 mm 8 Connection for mixing valve prio 2 28 mm Connections for prio 1 and return pipe behind the front insulation G 1 int 9 Immersion heater connection G 2 int 10...

Страница 18: ...es is in conformity with requirements of the following directiv auf das sich diese Erkl rung bezieht konform ist mit den Anforderungen der Richtlinie EC directive on Pressure Equipment Directive 97 23...

Страница 19: ......

Страница 20: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 161 421 50 10 01...

Отзывы: