17
Installation -
Electrical Connection
STEP
A
Connect lead coming from
the Maestro BAL fan unit to
the
Smart Box
STEP
B
Connect the power supply
lead to the
Smart Box
STEP
C
Connect the power supply to
a mains socket. Turn on and
check fan runs freely.
STEP
D
Using either the supplied
screws or cable ties
,
mount
the
Smart Box
on a suitable
piece of structure that does
not place the
it
near
direct
sunlight or the airflow of the
Maestro BAL.
STEP
E
Set the control mode by
pressing the button on the
side of the
Smart Box
.
Please
note the default 30% fixed
speed cannot be reactivated
if changed.
Ensure the power supply
is not in contact with
damp or wet areas.
Smart Box
Power Supply
How the connectors clip together
Connection
Connection
Maestro BAL
Warning: If using AiroMatic to comply
with NCC Performance Solution, be
careful not to accidentally press the
'Mode Button' on the smart box
Содержание Bradford Maestro BAL
Страница 1: ...Product Manual ...
Страница 3: ...3 4 1 2 3 ...
Страница 25: ...25 Notes ...
Страница 26: ...26 Notes ...
Страница 27: ...bradfordventilation com au ...