15
Installation -
Metal Roof
STEP 12
Using a soft rubber
hammer, carefully
work around the sides
and lower edge of the
flashing to form it into
the corrugations of the
metal sheeting profile.
For BAL installs this
must be done with care
to ensure that no gaps
greater than
2mm
are
present.
STEP 13 - NON BAL
ONLY
To assist with
weatherproofing a bead
of silicone sealant can
be applied between the
sheeting and the side
and front edges of the
flashing.
THIS SHOULD NOT BE
DONE FOR BAL ZONE
INSTALLATIONS DUE TO
THE COMBUSTIBLE
NATURE OF SEALANTS.
Содержание Bradford Maestro BAL
Страница 1: ...Product Manual ...
Страница 3: ...3 4 1 2 3 ...
Страница 25: ...25 Notes ...
Страница 26: ...26 Notes ...
Страница 27: ...bradfordventilation com au ...