background image

8.

CUT THE CONTINUOUS ALUMINUM CRASH RAIL RETAINER TO LENGTH USING THE REQUIRED DEDUCTIONS (SEE LAYOUT VIEW).

NOTE:  IT IS RECOMMENDED THAT THE ACROVYN COVER AND ALUMINUM RETAINER BE CUT WITH AN 80-100 TOOTH CARBIDE TIPPED SAW BLADE
OR EQUIVALENT.

9.

CUT RC-10 CUSHION TO LENGTH NOTING REQUIRED DEDUCTIONS (SEE LAYOUT VIEW) AND INSTALL ONTO ALUMINUM RETAINER.

10. ATTACH CRASH RAIL END CAPS AND OUTSIDE CORNERS:

·

SLIDE 1/4-20 x 3/4" HEX HEAD BOLTS IN THE RECEIVER SLOT OF THE CRASH RAIL RETAINER FOR ALL WALL BRACKETS.

·

USE CRASH RAIL END CAP AS A TEMPLATE TO DRILL CLEARANCE HOLES IN RETAINER.

·

ATTACH END CAP/OUTSIDE CORNERS BY SLIDING THE END CAP ONTO THE END OF THE ALUMINUM RETAINER AND SECURING INTO

POSITION USING TWO (2) #10-24 X 1/2" RD HD SLOTTED MACHINE SCREW WITH LOCK WASHER AND #10 HEX NUT AT EACH END CAP AND
FOUR (4) AT EACH OUTSIDE CORNER.

NOTE:  TO AID IN LOCATING THE END CAPS CORRECTLY, CUT A 4" [101.6mm] SECTION OF COVER FROM SCRAP AND SNAP IT ON THE RETAINER.
LOCATE THE CAP SO IT ALIGNS FLUSH WITH TOP AND BOTTOM OF THE COVER.

11. ATTACH THE ALUMINUM CRASH RAIL RETAINER TO THE WALL BRACKETS BY ALIGNING THE HEX HEAD BOLT WITH THE MOUNTING

BRACKETS AND INSERTING THE HEX HEAD BOLT INTO THE MOUNTING BRACKET HOLE.  PLACE A 1/4" FLAT WASHER AND 1/4-20 HEX NUT
ONTO THE HEX HEAD BOLT AND TIGHTEN AS REQUIRED.

12. CUT THE ACROVYN COVER TO THE PROPER LENGTH.  THE COVER LENGTH IS DETERMINED BY MEASURING THE DISTANCE BETWEEN THE

INSTALLED END CAPS AND/OR OUTSIDE CORNER ASSEMBLIES.

NOTE:  IT IS RECOMMENDED THAT THE ACROVYN COVER BE CUT SLIGHTLY LONGER (1/32" [0.8mm] UP TO 5'-0" [1.5m], 1/16" [1.6mm] OVER 5'-0"
[1.5m]) THAN THE MEASURED DISTANCE.  THIS ADDITIONAL LENGTH WILL PROVIDE FOR A TIGHTER COVER-TO-END CAP FIT.

13. STARTING AT ONE END, SNAP THE ACROVYN COVER ONTO THE RETAINER ALONG THE LENGTH OF THE CRASH RAIL.

NOTE:  MANUFACTURER RECOMMENDS ALL PRINTED "PRODUCT IDENTIFICATION" ON THE REAR OF THE ACROVYN PROFILE SHALL BE ORIENTED
IN THE SAME DIRECTION DURING INSTALLATION TO ENSURE PROPER ALIGNMENT AT SPLICE BUTT JOINTS.

P-OMAN HANDRAIL

TYPICAL CRASH RAIL ASSEMBLY

24POMAN

CRASH RAIL

END CAP

RETAINER SPLICE BAR AND

FASTENERS #1, #2, #7

CRASH RAIL OUTSIDE
CORNER FLANGE

CRASH RAIL OUTSIDE
CORNER ASSEMBLY

ACROVYN CRASH RAIL COVER

ALUMINUM CRASH RAIL RETAINER

RC-10 CUSHION

FASTENER #7

CRASH RAIL

END CAP

FASTENER #4

FASTENER #2 AND

FASTENER #6

FASTENER #8, #9

Doc#: II-24POMAN

Issue Date: 03/23/10

Rev Date: 11/09/18

Содержание P-OMAN

Страница 1: ...IZE EXPANSION AND CONTRACTION 9 MAY REQUIRE USE OF FIRE PUTTY WHEN INSTALLED ON FIRE WALL WITH TOGGLE BOLTS REFERENCE INSTRUCTIONS 24FIREPUTTY FOR FIRE PUTTY INSTALLATION 10 THIS HANDRAIL REQUIRES A M...

Страница 2: ...OUTSIDE CORNER ASSEMBLY FASTENER 6 1 4 FLAT WASHER 90H007003 FASTENER 7 1 4 20 X 3 4 HEX HEAD MACHINE SCREW 90H008002 P OMAN HANDRAIL COMPONENTS WALL FASTENERS 24POMAN FASTENER 4 10 24 X 1 2 ROUND HE...

Страница 3: ...ENGTH 1 8 3 2mm P OMAN HANDRAIL LAYOUT VIEW 24POMAN POWDER COATED HANDRAIL LENGTH 3 76 1mm 1 25 5mm 3 76 2mm MAX FIRST BRACKET LOCATION FROM CORNER OF WALL 3 76 2mm 4 101 6mm ALUMINUM CRASH RAIL RETAI...

Страница 4: ...HANDRAIL OUTSIDE CORNER CRASH RAIL OUTSIDE CORNER ASSEMBLY FASTENER 3 HANDRAIL SPLICE PLATE WITH FASTENER 3 RC 10 CUSHION ACROVYN CRASH RAIL COVER ALUMINUM CRASH RAIL RETAINER FASTENER 5 HANDRAIL END...

Страница 5: ...GROOVE AND MARK THE HOLE LOCATIONS REMOVE OUTSIDE MOUNTING PLATE AND DRILL HOLES 1 8 DRILL ALIGN HOLES OF INSIDE MOUNTING PLATE HANDRAIL AND OUTSIDE MOUNTING PLATE ATTACH USING 6 32 x 3 4 FH MACHINE S...

Страница 6: ...Y ALIGNING THE HEX HEAD BOLT WITH THE MOUNTING BRACKETS AND INSERTING THE HEX HEAD BOLT INTO THE MOUNTING BRACKET HOLE PLACE A 1 4 FLAT WASHER AND 1 4 20 HEX NUT ONTO THE HEX HEAD BOLT AND TIGHTEN AS...

Страница 7: ...UTSIDE CORNER INSTALLATION 1 ATTACH ALL OUTSIDE CORNERS USE OUTSIDE CORNER AS A TEMPLATE TO DRILL 7 32 PILOT HOLES IN RETAINER ATTACH OUTSIDE CORNERS BY SLIDING THE CORNER ONTO THE END OF THE ALUMINUM...

Отзывы: