![Crown OB-2-2-27-G Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/crown/ob-2-2-27-g/ob-2-2-27-g_installation-and-operation-manual_2690082008.webp)
INSTALLATION & OPERATION MANUAL 10104 REV 3 (08/22)
PAGE
8
OF 20
Oyster Bars, Gas Boilers
O
PERATION
For CSD-1 equipped boilers, see this section for CSD-1 Optional Feature for proper operating instructions.
O
peration
WARNING
Do not force the gas control knob. Use only your hand to turn the gas control knob. Never use any tool. If the
gas control knob will not operate by hand the gas control should be replaced by a qualified service technician.
WARNING
Do not disassemble the gas control; it contains no replaceable components.
Attempted disassembly or repair may damage the gas control.
WARNING
In the event of main burner ignition failure, a 5 minute purge period must be observed prior to
re-establishing ignition source.
B
oiler
C
ontrols
(
Inside Cabinet
)
Main Power Switch
- ON fills the boiler tank and turns the boiler controls on. You should allow 20 minutes to fill
the tank and generate steam.
- OFF shuts off the boiler controls and opens the automatic blowdown valve, emptying the
boiler tank and releasing water and steam to the drain. This should be done at least once
daily to remove sediment, lime or scale.
Pilot Light
- Indicates main power is ON.
Boiler Pressure Gauge
- Should read 9 -11 psi during operation; 0 psi during shutdown.
Water Level Sight Glass
- Observe level of water in the boiler and water quality. Murkiness in the water indicates
inadequate water quality; the owner must supply proper water to the boiler. See page 4
Water Quality Statement.
Water Level Control
- While ON, briefly open the water level control once each week to remove any sediment
that might accumulate
Safety Valve
- This valve will release (pop off) if the boiler has too much pressure. Once a week,
this valve should be tripped during operation to make sure it functions properly.