![Crown OB-2-2-27-G Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/crown/ob-2-2-27-g/ob-2-2-27-g_installation-and-operation-manual_2690082007.webp)
INSTALLATION & OPERATION MANUAL 10104 REV 3 (08/22)
PAGE
7
OF 20
Oyster Bars, Gas Boilers
CAUTION
The pipe thread compound used when installing pipes must be a type that is resistant to the action of liquified
petroleum or propane gases.
WARNING
Prior to start-up, check all joints in the gas supply line for leaks. Use soap and water solution.
Do not use an open flame.
Contact your gas company for correct supply line sizes.
Purge the supply line to clean out any dust, dirt, or foreign matter before connecting the line to the unit.
I
nstallation
Codes require that a gas shut-off valve be installed in the gas line prior to the steamer. Make sure the pipes are clean and
free of obstructions, dirt, and piping compound.
Do not connect the appliance to the electrical supply until after the gas connection has been made.
Electrical Connections
120 VAC-60 Hz - Single Phase
Make electrical connection to terminal block provided in the rear of the appliance. A separate 15A supply is required for
each appliance.
Refer to the electrical diagram located inside cabinet on door.