Performance Check
P
erformance
C
heck
The following items should be checked before or within the first 30 days of operation by a qualified service technician.
1. Verify correct gas type.
2. Verify correct voltage, cycle and phase.
3. Gas pressure.
4. Internal gas connections.
5. Internal electrical connections.
6. Pilots - adjustment and ignition.
7. Burners - adjustment and ignition.
8. Thermostat - cycle for operation check.
9. Supply valve - check for operation.
10. Check hinge and lid assembly.
11. Draw-off valve - check operation.
12. Advise user on cleaning procedures.
13. Tilt Mechanism - make sure the unit is levelled in all directions and anchored to the floor. See page 6.