background image

INSTALLATION AND OPERATION MANUAL, DIRECT STEAM TILTING KETTLES, MODELS DLT, DPT

Part No. 10077R3

10

2013-07-16

6.0  MAINTENANCE 

PREVENTIVE MAINTENANCE

No preventive maintenance is required other than adhering to the Cleaning Procedure
instructions.  

SAFETY VALVE MAINTENANCE AND TESTING

CAUTION!  Under normal operating conditions a “try lever test”
should be performed every two months.  Under severe service
conditions, or if corrosion and/or deposits are noticed within the
valve body, testing must be performed more often.  A “try lever test”
should also be performed at the end of any non-service period.

CAUTION!  Hot, high pressure fluid may be discharged from body
drain and vent during “try lever” test.  Care must be taken to avoid
any bodily contact.

CAUTION!  High sound levels may be experienced during “try lever”
test.  Wear proper safety equipment and exercise extreme care! 
Test at, or near, half of the operating pressure by holding the test
lever fully open for at least two seconds to flush the valve seat free
of sediment and debris.  Then release lever and permit the valve to
snap shut. 

If lift lever does not activate, or there is no evidence of discharge,
turn off equipment immediately and contact a licensed contractor or
qualified service personnel.  

Содержание DLT-100

Страница 1: ...and maintenance instructions thoroughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipm...

Страница 2: ...all safety messages that follow this symbol to avoid possible injury or death WARNING Improper installation operation adjustment alteration service or maintenance can cause property damage injury or d...

Страница 3: ...7R3 3 2013 07 16 TABLE OF CONTENTS DESCRIPTION PAGE SERVICE CONNECTIONS DLT 4 SERVICE CONNECTIONS DPT 5 1 0 INSTALLATION INSTRUCTIONS 6 2 0 INTRODUCTION DESCRIPTION 7 3 0 BASIC FUNCTIONING 7 4 0 OPERA...

Страница 4: ...INSTALLATION AND OPERATION MANUAL DIRECT STEAM TILTING KETTLES MODELS DLT DPT Part No 10077R3 4 2013 07 16 SERVICE CONNECTIONS...

Страница 5: ...INSTALLATION AND OPERATION MANUAL DIRECT STEAM TILTING KETTLES MODELS DLT DPT Part No 10077R3 5 2013 07 16 SERVICE CONNECTIONS...

Страница 6: ...base making contact with floor surface to fulfil NSF requirements 6 Connect steam line 3 4 pipe size to the kettle making sure there is a steam control valve strainer fairly convenient to the kettle...

Страница 7: ...that kettle in U S gallons Thus a DLT 40 is a two thirds jacketed direct steam kettle mounted on legs with a capacity of 40 gallons U S If the letter F is added to the suffix this indicates that the k...

Страница 8: ...steam supply is OFF 2 Pre rinse inside of kettle thoroughly and drain to remove any food particles 3 Using a nylon brush clean kettle with a mild detergent and warm water rinse Never use steel wool or...

Страница 9: ...ents that are corrosive Use of cleaning agents that contain chloride acids or salts are corrosive and may cause pitting and corrosion when used over a period of time this will reduce the life of the a...

Страница 10: ...lever test should also be performed at the end of any non service period CAUTION Hot high pressure fluid may be discharged from body drain and vent during try lever test Care must be taken to avoid an...

Страница 11: ...the rubber vulcanized stem piece has been damaged and must be replaced EXTREMELY SLOW COOKING TIME If the cooking time is abnormally slow then the difficulty may be due to insufficient steam pressure...

Страница 12: ...at 30 p s i reaches a temperature of 274 degrees Fahrenheit 135 degrees Celsius Since air is an unsuitable media through which heat may be transferred the air should be exhausted from the jacket by op...

Отзывы: