![Crown CG-214 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/crown/cg-214/cg-214_installation-and-operation-manual_2690068019.webp)
INSTALLATION AND OPERATION MANUAL, GAS BOILERS,
MODELS CG-214(E), CG-314(E), CG-414(E), CG-220(E), CG-320(E), CG-325(E), CG-330(E)
PART NUMBER 10042R3
19
2005-12-19
BOILER DESCALING INSTRUCTIONS
(Continued)
6.
Let appliance cycle, allowing two hours for descaling and cleaning.
DO NOT TURN
STEAM ON TO CONNECTED APPLIANCES OR TO UPPER COMPARTMENTS.
7.
Open both the blowdown and low water level control valves for complete drainage. Then
close both valves.
For appliances equipped with automatic blowdown, turn OFF power switch and open low
water control valve. This will allow complete drainage. Once drained close water level
control valve.
8.
Turn appliance switch ON. When boiler is completely filled, turn power switch OFF. This
will rinse and drain boiler. Appliance with manual blowdown valve must be opened to
drain.
9.
Complete Step 8 twice to assure boiler is completely rinsed.
10. Appliance is now ready for use.
7.0 ADJUSTMENTS
TO CALIBRATE PRESSURE SWITCHES
WARNING: At least twice a year have an authorized service person clean and
adjust the unit for maximum performance.
NOTE: Pressure switches are factory set. Calibration is only required if
pressure switches are replaced or if adjustment is required.