INSTALLATION AND OPERATION MANUAL, GAS BOILERS,
MODELS CG-214(E), CG-314(E), CG-414(E), CG-220(E), CG-320(E), CG-325(E), CG-330(E)
PART NUMBER 10042R3
13
2005-12-19
5.0 OPERATION INSTRUCTIONS FOR CSD-1 EQUIPPED UNITS
Initial Start-Up Procedure
1. Open the manual gas shut-off supply valve.
2. Close the manual blowdown valve, if so equipped.
3. Light the pilot burner.
The dial on the combination gas valve has three positions (ON-OFF-PILOT) for manual gas
control of main burners and pilot burner. Turn the dial to PILOT. Depress the dial and light
the pilot burner on the centre burner of boiler. Maintain the dial in depressed position for
about 30 seconds and release. Observe that the pilot flame stays ON. Turn dial to “ON”.
4. Open cabinet door and turn “ON” the power switch. The green pilot light will come “ON”.
Water will begin to enter the boiler. When enough water has entered the boiler the (amber)
“STAND BY” pilot light will come on.
5. Press the “RESET” switch to begin boiler operation. The “STAND BY” pilot light will go off
and the boiler will begin operation.
If at anytime the flame should become extinguished, a five (5) minute purging is required before
relighting is attempted.
Daily Startup Procedure
1. Close the manual blowdown valve, if so equipped.
2. Examine that the pilot burner flame is burning. If the pilot burner is out, a five (5) minute
period of complete gas supply shut off is required before relighting. Follow initial start up
instructions above.
3. Open cabinet door and turn “ON” the power switch. The green pilot light will come “ON”.
Water will begin to enter the boiler. When enough water has entered the boiler the (amber)
“STAND BY” pilot light will come on.
4. Press the “RESET” switch to begin boiler operation. The “STAND BY” pilot light will go off
and the boiler will begin operation.