XI  Start-up and Checkout

WARNING

NEVER ATTEMPT TO FILL A HOT EMPTY BOILER.

MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM
COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER FLAMMABLE VAPORS AND LIQUIDS.

SAFE  RELIABLE OPERATION OF THIS BOILER REQUIRES THAT THE BURNER BE CHECKED
AND ADJUSTED BY A QUALIFIED OIL SERVICEMAN USING COMBUSTION TEST
INSTRUMENTS.

FAILURE TO PERFORM ALL OF THE CHECKS OUTLINED IN THE FOLLOWING PROCEDURE
COULD RESULT IN UNRELIABLE OPERATION, DAMAGE TO THE BOILER NOT COVERED
UNDER WARRANTY, PROPERTY DAMAGE, OR UNSAFE OPERATION.

Use the following procedure for initial start-up of the boiler:

1) Ensure that the boiler is filled to the normal water level.
2) Verify that the vent system is complete and free of obstructions prior to start-up of the boiler.
3) Inspect all wiring for loose or uninsulated connections, proper size fuses installed, etc.
4) Verify that oil tank is filled with #2 fuel oil meeting ASTM D396 specifications, oil piping has been tested and is air tight,
and shut-off valve(s) are closed.
5) Check initial settings of oil burner air band and air shutter, head setting etc. and readjust if needed. See Table 3 for setup
and combustion data pertaining to a particular boiler/ burner combination.
6) Attach plastic hose to oil pump vent fitting and provide a container to catch oil during oil pump bleeding procedure.
7) Install 0-200 PSI pressure gauge into oil pump gauge port.
8) Open all oil line shut-off valves.
9) Open flame observation port cover on burner swing door to see flame.
10) Adjust system thermostat to highest setting.
11) Set pressure limit control to suit individual requirements of the installation. For most steam systems, the cut-in pressure
should be set at 0.5 psi with a 1 psi differential.
12) Turn the line service switch to “ON” position.
13) Crack open vent fitting on the oil pump and allow burner to run until a solid oil stream, free of air bubbles, flows for 15
seconds into container. As the vent fitting is closed, the burner should fire and flame should be visible through observation
port immediately (or after prepurge timing has expired, if a burner is so equipped). Refer to burner instructions for more
details.
14) Immediately upon firing the boiler, check the smoke level. If the smoke level is in excess of a #1, open the air adjustment
to bring the smoke level below a #1.
15) Make sure that the oil pressure matches that shown in Table 3 for the burner supplied. Adjust pressure if required.
16) Check the vacuum at the inlet of the fuel pump. Make sure that the vacuum does not exceed the fuel pump manufacturer’s
limit (consult the pump manufacturer’s instructions).
17) Close the flame observation cover.
18) After chimney has warmed-up to operating temperature, adjust barometric draft regulator for a draft of -0.02 inch w. c.
over the fire.
19) Check the CO2 and confirm that it is between the minimum and maximum limits shown in Table 3. Adjust if necessary.
20) Verify that the smoke level still does not exceed #1 and that the draft over fire is -0.02 inch w.c.
21) Turn off the burner and remove pressure gauge. Install and tighten gauge port plug, than restart the burner.
22) Check for clean cutoff of the burner. Air in the oil line between fuel pump and nozzle will compress, while burner is
running, and expand, when burner shuts off, causing oil line pressure to drop and nozzle drip after burner stops. Cycle burner
on and off 5 to 10 times to purge air completely.
23) Check thermostat operation by raising or lowering its set point as required, cycling burner on and off.

23

Содержание KSZ065 KSZ075 KSZ100 KSZ090

Страница 1: ...535 8900 Fax 215 535 9736 www crownboiler com Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 WARNING Improper installation adjustment alteration service or...

Страница 2: ...d by natural draft into a lined masonry or metal chimney or Type L vent An adequate supply of air for combustion ventilation and dilution of flue gases must be available in the boiler room This boiler...

Страница 3: ...ented 1 There is sometimes an accelerated rate of soot buildup on the oil burner cad cell spinner etc 2 There is a potential for severe damage to the side of the structure in the event that the boiler...

Страница 4: ...used follow vent pipe manufacturer recommendations for minimum clearances 3 Do not install this boiler directly on a combustible surface Where it is desired to install the KSZ over a non carpeted comb...

Страница 5: ...Openings Aligned To Permit Free Air Circulation 4 MIN Combustible Surface FIGURE 3 INSTALLATION OVER A COMBUSTIBLE FLOOR 4 6 6 18 6 24 LH SIDE CLEARANCE 24 FOR FLOAT TYPE LWCO EQUIPPED BOILERS CLEARAN...

Страница 6: ...ing and the bottom edge of the lower opening must be within 12 of the floor Figure 4 Each opening must have a free area of 1 square inch per 1000 BTU hr input of all fuel burning appliances in the boi...

Страница 7: ...7 FIGURE 4 BOILER INSTALLED IN CONFINED SPACE ALL AIR FROM INSIDE 6 FIGURE 5 ALL AIR FROM OUTDOORS VENTILATED CRAWL SPACE AND ATTIC...

Страница 8: ...8 7 FIGURE 6 ALL AIR FROM OUTDOORS VIA VENTILATED ATTIC FIGURE 7 ALL AIR FROM OUTDOORS USING OPENINGS INTO BOILER ROOM...

Страница 9: ...9 FIGURE 8 ALL AIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM 8...

Страница 10: ...and Solid Fuel Burning Appliances NFPA 211 and lined with a clay liner or other listed lining system Do not vent a KSZ series boiler into an unlined chimney 2 Acceptable Vent Connectors The following...

Страница 11: ...nd the boiler collar as well as the barometric draft regulator Use at least three screws at each joint TABLE 2 MINIMUM RECOMMENDED BREECHING AND CHIMNEY SIZE Power Side Wall Venting Important Note Two...

Страница 12: ...is to separate tiny water droplets from the steam exiting the boiler so that dry steam is sent to the system If the near boiler piping is not correct wet steam will enter the system and the following...

Страница 13: ...lve spindle must be in vertical position into the 3 4 tapping on top of the boiler 3 Pipe the discharge of the safety relief valve to a location where water or steam will not create a hazard or cause...

Страница 14: ...ween the boiler and the circulator inlet All piping between the boiler and the circulator inlet should be 1 regardless of the size of the piping required in the rest of the system See Figure 17 in Par...

Страница 15: ...ackflushed to remove sediment WARNING A mixing valve does not eliminate the risk of scalding Set the mixing valve and boiler low limit adjustments as low as possible Feel water before showering or bat...

Страница 16: ...r system if needed 6 Unions Required Tankless heaters may require periodic gasket replacement or other maintenance which requires removal of the heater from the boiler Install unions anywhere in the t...

Страница 17: ...See Figure 13 A vertical distance from top of the tank to center line of the pump Dimension H over 8 feet will result in a pump inlet pressure in excess of the 3 psi limit in NFPA 31 b ONE PIPE LIFT...

Страница 18: ...ed to a one pipe gravity system as doing so will result in lower inlet line flow and longer filter life d TWO PIPE LIFT SYSTEM used when a fuel oil storage tank is located below an oil burner fuel pum...

Страница 19: ...l it as shown in the pump manufacturers s instructions Do not install this bypass plug on one pipe systems as pump seal damage will result 5 Do not use check valves especially on gravity feed systems...

Страница 20: ...cuit between thermostat and boiler Connect thermostat wire leads to terminals T and T on the burner primary control 3 Optional Tankless Heater Wiring Install the L4006Awith the 3 4 NPT well in the 3 4...

Страница 21: ...he CG450 2 Using McDonnell Miller WF2 U 120 feeder Do not alter factory boiler wiring Connect WF2 U 120 to CG450A as follows Connect terminal 1 on the feeder to terminal A on the CG450 Connect termina...

Страница 22: ...22 FIGURE 18a WIRING MCDONNELL MILLER 101A 120 OR HYDROLEVEL VXT 120 FEEDER TO BOILER EQUIPPED WITH 67 L W C O FIGURE 18b WIRING MCDONNELL MILLER WF2 U 120 FEEDER 21...

Страница 23: ...BURNERS CONSULT BURNER INSTRUCTION MANUAL FOR OTHER BURNERS CAD CELL 24 VOLT THERMOSTAT L4006A LIMIT CONTROL TANKLESS EQUIPPED BOILERS ONLY L1 INTERRUPTED INTERMITTENT BURNER MOTOR LIMIT VALVE L2 NOT...

Страница 24: ...steam systems the cut in pressure should be set at 0 5 psi with a 1 psi differential 12 Turn the line service switch to ON position 13 Crack open vent fitting on the oil pump and allow burner to run...

Страница 25: ...til about one inch of water is visible in gauge glass c Run a hose or temporary piping from the boiler drain valve to a location where hot water can be safely discharged Drain approximately five gallo...

Страница 26: ...SETTING 0 0 1 0 1 2 0 3 3 DRAFT OVER FIRE in w c MAX SMOKE bacharach scale FLUE CO2 MIN 11 0 11 0 11 0 11 0 11 0 11 0 11 0 11 0 11 0 MAX 12 5 12 5 12 5 12 5 12 5 12 5 12 5 12 5 12 5 PREPURGE IGNITION...

Страница 27: ...Hydrolevel CG450 manual for any additional maintenance information Test the low water cut off before placing the boiler back into service For McDonnell Miller 67 low water cut offs Remove and inspect...

Страница 28: ...ng order Vents should not permit any passage of steam or water Check all steam and return piping for leaks Be aware that buried return piping can leak and go undetected during normal operation 3 Allow...

Страница 29: ...e any accumulations of dust hair etc from the air shutter blower wheel and other air handling parts of the burner 5 Replace the fuel oil line filter element and gaskets 6 Inspect all oil piping and fi...

Страница 30: ...a 1ea 1ea 1ea 1ea 1ea 1ea 1ea 1ea 11 REFRACTORYBLANKET 1ea 275003 275003 275003 275004 275004 275004 275005 275005 275005 12 SWINGDOOR 270020 1ea 1ea 1ea 1ea 1ea 1ea 1ea 1ea 1ea 20 1 2 x1 SEALINGSTRIP...

Страница 31: ...31 30...

Страница 32: ...2 ea 2 ea 2 ea 2 ea 2 ea 2 ea 2 ea 2 ea 2 ea 54 TWIST RECEPTICAL 96 010 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 55 TWIST RECEPTICAL COVER 96 019 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 1 ea 56 PR...

Страница 33: ...33 32...

Страница 34: ...34 Tel 215 535 8900 Fax 215 535 9736 www crownboiler com Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 CROWN Boiler Co Rev 2 05 03...

Отзывы: