XII Service and Maintenance

The following routine maintenance should be performed on an annual basis:

1)  Turn off electrical power and gas supply to the boiler

2)  Inspect the flue passages for signs of blockage. If there is any carbon in the combustion chamber or the flue passages,  

 

clean the heat exchanger before proceeding further. See the cleaning procedure below.

3)  Remove all burners, noting the location of the pilot main burner. If burners show signs of deterioration, they should be  

 

replaced (some discoloration around the burner ports is normal). Clean the burners by first brushing the ports with a soft  

 

bristle brush and then vacuuming out any debris through the venturi opening.

4)  Remove any debris found in the combustion chamber, being careful not to disturb combustion chamber insulation.

5)  Inspect the pilot assembly.  Clean any deposits found on the electrode and grounding strap. The ideal gap between the  

 

electrode and the ground strap is 1/8”. Inspect the porcelain for cracks or other deterioration. Replace pilot assembly if  

 

deterioration is found.

6)  Inspect the combustion chamber insulation for deterioration. 

7)  Inspect the ignition cable insulation for cracks or other deterioration. If deterioration is found, replace cable.

8)  Reinstall burners, being careful to put the pilot main burner in its original location.

9)  Inspect all boiler wiring for loose connections or deterioration.

10)  Inspect the vent system:

• 

Make sure that the vent system is free of obstructions.

• 

Make sure that all vent system supports are intact.

• 

Inspect joints for signs of condensate or flue gas leakage.

• 

Inspect venting components for corrosion or other deterioration. Replace any defective vent components.

WARNING

•  THE BOILER CONTAINS REFRACTORY CERAMIC FIBER, A POSSIBLE HUMAN 

CARCINOGEN.  USE A NIOSH APPROVED RESPIRATOR WHEN SERVICING 
HIGH-TEMPERATURE INSULATION AND GASKET MATERIALS.  WASH EXPOSED 
SKIN GENTLY WITH SOAP AND WATER AFTER CONTACT.  WASH EXPOSED 
CLOTHING SEPERATE FROM NORMAL LAUNDRY.

•  LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS.  

WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION.  
VERIFY PROPER OPERATION AFTER SERVICING.

•  FAILURE TO MAINTAIN THE BOILER IN PROPER WORKING CONDITION MAY 

LEAD TO FIRE, EXPLOSION, PERSONAL INJURY OR DEATH AND EXTENSIVE 
PROPERTY DAMAGE.

•  TURN OFF ALL GAS AND ELECTRIC POWER SUPPLIES TO THE BOILER BEFORE 

SERVICING.  CONTACT WITH OR RELEASE OF DANGEROUS FLAMMABLE 
GAS, ELECTRICAL VOLTAGE, MOVING PARTS AND VERY HOT WATER UNDER 
PRESSURE MAY CAUSE SERIOUS PERSONAL INJURY, PROPERTY DAMAGE OR 
DEATH.

•  LOCK ELECTRICAL BOXES AND GAS VALVES CLOSED TO PREVENT SOMEONE 

FROM INADVERTENTLY RESTORING POWER OF GAS BEFORE THE HEATING 
SYSTEM IS SAFE TO OPERATE.

•  WATER LEAKS CAN CAUSE SEVERE CORROSION DAMAGE TO THE BOILER OR 

OTHER SYSTEM COMPONENTS.  REPAIR ANY LEAKS FOUND IMMEDIATELY.

Содержание AWR Series

Страница 1: ...or assistance or additional information consult a qualified installer service agency or the gas supplier Read these instructions carefully before installing Models AWR038 AWR070 AWR105 AWR140 AWR175 A...

Страница 2: ......

Страница 3: ...ation start up or service Improper installation adjustment alteration service or maintenance may cause serious property damage personal injury or death DO NOT DISCONNECT PIPE FITTINGS on the boiler or...

Страница 4: ...ns 3 III Before Installing 4 IV Locating the Boiler 4 V Air for Combustion Ventilation 6 VI Venting 10 VII Gas Piping 13 VIII System Piping 14 IX Wiring 19 X Start Up Checkout 24 XI Operation 28 XII S...

Страница 5: ...d before selecting a boiler for installations having unusual piping and pickup requirements such as intermittent system opera tion extensive piping systems etc Add Suffix N for Natural Gas or Suffix L...

Страница 6: ...to have either the Heating Capacity required for the Mega Stor or the I B R Net Rating required for the heating system whichever results in the larger boiler For systems that incorporate other indirec...

Страница 7: ...FROM BOILER TO ALL TYPES OF COMBUSTIBLE CONSTRUCTION AND NONCOMBUSTIBLE CEILINGS WALLS AND DOORS CLOSET FIGURE 4 2 AWR245 280 MINIMUM CLEARANCE FROM BOILER TO ALL TYPES OF COMBUSTIBLE CONSTRUCTION AND...

Страница 8: ...ion air is drawn into the boiler room from other parts of the building and from the outdoors through natural infiltration cracks under doors etc This method can not be used in all cases see discussion...

Страница 9: ...nings connect is less than 50 cubic feet per 1000 BTU hr of total appliance input install a pair of identical openings into a third room Connect additional rooms with openings until the total volume o...

Страница 10: ...8ft high If two openings are installed into this basement that each have a free area of 135in2 the combined volume of the boiler room and basement will be 350ft3 6400ft3 6750ft3 and 6750 135 50ft3 per...

Страница 11: ...ave a free cross sectional area of 1 square inch per 4000 BTU hr of the total input of all gas fired appliances in the boiler room Minimum opening size is 3 inches Openings to outdoors via horizontal...

Страница 12: ...quipped with a draft hood which is built into the boiler do not attempt to install an external draft hood 1 Acceptable Chimneys The following chimneys may be used to vent AWR series boilers Listed Typ...

Страница 13: ...will not be subjected to winds which could affect power venter operation 6 Do not connect the vent of this appliance into any portion of a mechanical vent system operating under positive pressure 7 D...

Страница 14: ...imney In some cases when an existing boiler is removed from a common chimney the common venting system may be too large for the remaining appliances At the time of removal of an existing boiler the fo...

Страница 15: ...n venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 10 of the National Fuel Gas Code ANSI Z223 1 VII Gas Piping Gas piping to the boiler...

Страница 16: ...up to the Maximum Allowable Working Pressure shown on the rating plate If the valve is replaced the replacement must have a relief capacity in excess of the DOE heating capacity for the boiler Pipe th...

Страница 17: ...f may be a float type or probe type but must be designed for use in a hot water system The low water cutoff should be piped into the boiler supply just above the boiler with no intervening valves betw...

Страница 18: ...rs If necessary the supply and return may be connected to the left side of the boiler by moving the 1 1 4 plug and the relief valve fittings from the tappings in the left side of the boiler to the cor...

Страница 19: ...17 FIGURE 8 5 BOILER BYPASS PIPING FIGURE 8 6 ISOLATION OF BOILER FROM SYSTEM WITH A HEAT EXCHANGER...

Страница 20: ...valve and variable speed injection Circulatoring systems 5 Systems containing oxygen Many hydronic systems contain enough dissolved oxygen to cause severe corrosion damage to a cast iron boiler such a...

Страница 21: ...or greater A service switch is recommended and is required by many local codes Locate this switch in accor dance with local codes or in the absence of any in a location where it can be safely accesse...

Страница 22: ...Note When Option Plug 1 is not used the factory supplied jumper plug shown in Figure 9 1 must be installed for boiler to operate d Option Plug 2 Used to connect Crown optional touch screen display or...

Страница 23: ...21 FIGURE 9 0 LINE VOLTAGE FIELD CONNECTIONS FIGURE 9 1 LOW VOLTAGE FIELD CONNECTIONS...

Страница 24: ...22 FIGURE 9 2 INTERNAL CONNECTIONS DIAGRAM...

Страница 25: ...23 FIGURE 9 3 LADDER DIAGRAM...

Страница 26: ...rain will be filled with air Even if the gas line has been completely purged of air it may take several tries for ignition before a flame is established Once a flame has been established for the first...

Страница 27: ...ion above on this label 2 Set the thermostat to lowest setting 3 turn off all electric power to the appliance 4 this appliance is equipped with an ignition device which automatically lights the pilot...

Страница 28: ...elight 18 After the boiler has operated for approximately 30 minutes check the boiler and heating system piping for leaks Repair any leaks found at once 19 Inspect the vent system for flue gas leaks a...

Страница 29: ...RE 10 1 PILOT BURNER FLAME FIGURE 10 2 MAIN BURNER FLAME FIGURE 10 3 GAS VALVE DETAIL TABLE 10 4 FLUE GAS COMBUSTION READING Fuel Max CO2 Min O2 Max CO PPM Natural Gas 8 5 6 0 50 PPM Propane 10 0 5 8...

Страница 30: ...o see Figure 11 1 1 Status Mode This is the default mode of operation for the control In it the display alternates between StA and a number indicating the current status of the boiler A list and descr...

Страница 31: ...ODE Visible when Lockout is Present Code for Error Present Table 13 0 total burner Cycles Total Run Time hrs Press I Return to Status Mode Press or Boiler in Lockout Temperature Units Reset Circulator...

Страница 32: ...self AND a forced delay period has passed 14 Hard Lockout A fault has occurred which requires manual intervention before the boiler will again operate This intervention can be in the form of interrupt...

Страница 33: ...used as a second heating zone see Table 11 5 this parameter will be shown as OFF and tt will be shown as ON when this zone calls for heat FLA Flame Current Flame rectification signal uA run Run Time H...

Страница 34: ...t if all calls for heat end while the burners are off on high limit the burner will not restart during the next call for heat until the thermal purge requirements described below are met Or Circulator...

Страница 35: ...eous calls for heat and DHW are present the heating circulator will be forced off for as long as it takes the boiler to satisfy the call for DHW This feature is sometimes useful when the boiler size i...

Страница 36: ...If the blocked vent switch flame roll out switch and any external limits connected to Option Plug 1 are made 24 VAC will be applied across pin terminal 2 orange and 4 yellow at the vent damper and the...

Страница 37: ...main burner operation in the event that a blocked vent causes flue gas to spill from the draft diverter opening This switch is equipped with a reset button which must be pressed to restore normal bur...

Страница 38: ...its original location 9 Inspect all boiler wiring for loose connections or deterioration 10 Inspect the vent system Make sure that the vent system is free of obstructions Make sure that all vent syste...

Страница 39: ...ghly sealed to the heat exchanger 13 Reattach the flue collector 14 Reattach all the jacket components 15 Reinstall burners being careful to put the pilot main burner in its original location 16 Repla...

Страница 40: ...es 5 When checking voltage across at wiring connectors such as at the vent damper harness plug be careful not to insert the meter probes into the metal sockets Doing so may damage the socket resulting...

Страница 41: ...ground Pilot is damaged 58 AC Power Frequency Error 120VAC power supply frequency is incorrect Should be 60Hz 120VAC power supply is dirty consult electrician and or Utility Boiler water temperature...

Страница 42: ...rode porcelain or ignition wire insulation replace pilot Pilot electrode or Ground strap damaged replace pilot If you cannot hear spark at all replace control StA 6 Spark but no pilot flame Low inlet...

Страница 43: ...41 Notes...

Страница 44: ...SCRIPTION QTY OR CROWN PN QUANTITY PER BOILER OR CROWN PART NUMBER 38 70 105 140 175 210 245 280 1 COMPLETE HEAT EXCHANGER ASSEMBLY 1 EA 760012 760013 760014 760015 760016 760017 760018 760019 LEFT EN...

Страница 45: ...43...

Страница 46: ...4 760625 760626 760627 760628 760629 13 1 2 X 2 SEALING GASKET 900146 3 9 FT 4 4 FT 4 9 FT 5 4 FT 5 9 FT 6 4 FT 7 0 FT 7 5 FT 14 BASE SIDE INSULATION 760520 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 15...

Страница 47: ...45...

Страница 48: ...FICE 1 25MM DRILL 950345 2 EA 27 LP GAS ORIFICE 1 20MM DRILL 950346 4 EA 6 EA 8 EA 10 EA 12 EA 14 EA 16 EA 28 PILOT BURNER 150760 1 E A 1 EA 1 EA 1 EA 1 E A 1 EA 1 E A 1 EA 29 PILOT ASSEMBLY NAT GAS H...

Страница 49: ...ACKET PANEL 1 EA 760302 760303 760304 760305 760306 760307 760308 760309 39 VESTIBULE PANEL 1 EA 760332 760333 760334 760335 760336 760337 760338 760339 40 TOP JACKET PANEL 1 EA 760322 760323 760324 7...

Страница 50: ...2 WINDOW 900723 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 54 CROWN NAMEPLATE 98 004 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 55 DOOR KNOB 90 210 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 2 EA 3 4 RELIEF VALVE 3...

Страница 51: ...Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 www crownboiler com PN 980763 Rev 2 07 13...

Отзывы: