background image

88

APPENDIX C  –  VALVE AND ACTUATOR MOUNTING INSTRUCTIONS

   Application

    For use with ESBE ½” to 6” 3-Way and 4-Way rotary valves for mixing and diverting applications. Use with 24Vac 3-point “floating” signal controller.

 

Mounting the Motor

1.

 Place drive sleeve 

 onto shaft and secure with bolt 

. Check that the valve is in mid-position (sleeve pointer set to position 5 on scale plate).

2. 

Mount threaded stud 

 in one of the threaded holes. For 1½” and 2" valves replace one of the cover bolts with the threaded rod. Tighten 

    mounting piece 

 onto threaded rod.

3.

 Mount handle 

 over drive sleeve set pointer to 5 on the scale plate. Handle must be mounted opposite to the pointer of the drive sleeve.

4.

 Mount motor onto sleeve so that the mounting piece m fits into the locking piece o. Push locking piece to lock in place. Labels are supplied

    to indicate the direction of rotation. Determine the direction of rotation and mount the correct label under the plastic front cover of motor.

Manual Operation

Always disconnect power before operating by hand. Note 

position of drive sleeve pointer to be returned to. Depress 

the  gray  button,  “A”,  on  the  side  to  release 

the  handle.  The  valve  can  now  be  operated 

manually. 

Never  manually  operate  when 

gears are engaged.

Adjusting Cams

 

The position of the cams is changed by fitting a screw-

driver in the slot and moving the cam to the desired 

position.The topmost cam operates the auxiliary 

switch (upper switch – NOT USED). The middle and 

lower cams determine the degree of rotation (30

°

 to 

180

°

). To access, remove the actuator cover to gain 

access to the middle and lower cams.The valve rota-

tion must be set before operation can begin.  Adjust 

the cam so that each end switch is made when the 

valve is fully open (pointer towards “0”) and when the 

valve is fully closed (pointer towards “10”).  Depress 

the “Test” switch on the RTC control to test for proper valve operation.

Содержание 24-03

Страница 1: ...njury or loss of life For assistance or additional information con sult a quali ed installer service agency or the gas supplier This boiler requires a special venting system Read these instructions ca...

Страница 2: ...2...

Страница 3: ...n a t S l a n o i t a N n a c i r e m A f o n o i t i d E t n e r r u C s t n e m e r i u q e r g n i t n e V r o F s e c n a i l p p A g n i n r u B l e u F d i l o S d n a s t n e V s e c a l p e r...

Страница 4: ...flooring Do not install boiler on carpeting Do not operate on floors where heat affected material is below Do not tamper with or alter the boiler or controls Retain your contractor or a competent serv...

Страница 5: ...n a n o s a e s g n i t a e h e h t f o t r a t s e r a s m e t s y s e k a t n i r i a d n a g n i t n e v d e t c u r t s b o n u d n a n a e l C s n o i t c u r t s b o y n a r o f n o s a e s d n...

Страница 6: ...g Domestic Hot Water DHW Applications 33 Tankless Heater Piping 41 Electric Wiring 43 Return Temperature Control RTC and Components 43 SECTION IV OPERATING INSTRUCTIONS Filling System 47 Adjusting Con...

Страница 7: ...ith without priority using Indirect Water Heater and Outdoor reset A4 3 way RTC in Primary Secondary Indirect Water Heater as load on primary loop without Outdoor reset A5 3 way Multiple Boiler RTC in...

Страница 8: ...8 Section I General Information FIGURE 1 Dimensional Information...

Страница 9: ...5 0 5 1 8 8 7 4 9 4 1 1 9 0 3 1 0 0 3 1 7 6 8 1 1 5 3 1 8 7 5 1 2 4 1 0 4 0 4 0 1 0 9 2 1 8 4 0 4 7 5 2 4 0 1 1 1 4 2 5 0 5 0 9 6 1 9 2 4 5 3 0 3 1 0 7 4 1 0 6 4 1 3 9 0 2 5 9 4 1 0 5 7 1 7 5 1 5 4 5...

Страница 10: ...25 12 Dia 43 28 NOTICE Recommended clearance for service may be reduced to minimum clearance to combustible material However increased service and maintenance difficulty will result WARNING Boiler is...

Страница 11: ...spaces crawl or attic that communicate with the outdoors a Where communicating by means of vertical ducts each opening shall have a free area of not less than 1 sq inch per 4 000 Btuh 35 sq inch per g...

Страница 12: ...aft typically three 3 feet above the roof line see Figure 3a The damper shall be adjusted to maintain a positive pressure of 0 1 W C in the vent connector box during burner high re operation see breec...

Страница 13: ...ng the edge of the section with the wire brush d Open the Boiler Assembly Carton s and remove the bottle of adhesive Using the dauber supplied in the bottle apply the adhesive to the groove Be sure to...

Страница 14: ...ive was applied it may be necessary to reapply Continue to af x the rope to the groove in this fashion around the perimeter of the section Make sure that the rope does not droop or hang outside of the...

Страница 15: ...lugs with dual holes are cast in the four 4 corners of each casting Starting with the upper holes install four 4 5 8 x 9 long draw up rods along with washers and nuts see Figure 9 NOTICE The sections...

Страница 16: ...s between adjoining sections should be spaced 1 4 to 3 8 apart Spacing of more than 3 8 will limit number of sections that can be drawn up in one unit and could indicate cocked nipples On long boiler...

Страница 17: ...ons make contact at the ground joints g After all sections have been drawn up but before removing the hydraulic rams and draw up rods the 9 long tie rods must be installed The large draw up rod lugs w...

Страница 18: ...r through concealed breakage caused in shipping and handling This precaution is for your protection and will simplify handling of necessary replacements and adjustment claims 5 After making certain th...

Страница 19: ...tlet cover that mounts against the canopy and back section Gasket must be centered over all attachment holes Do not overlap corners cut butt joints 10 Attach either the rear ue outlet damper assembly...

Страница 20: ...20 Figure 16 Bare Boiler Assembly...

Страница 21: ...eeved loose tting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from ot...

Страница 22: ...ver cleanout openings on left side of boiler as shown in Figure 19 See Important Product Safety Information on Page 21 of this manual regarding refractory ceramic ber product warning 1 Locate the cove...

Страница 23: ...piping in a similar manner c Attach jacket top panel to the front panel rear panel and upper tie bar panels with sheet metal screws 7 Install Jacket side Panels a Snap black thumb hole bushings into a...

Страница 24: ...24 Figure 22 Series 24 Jacket Assembly Boiler Models 24 03 thru 24 12...

Страница 25: ...ed burner will be provided by Crown 2 Open Adaptor Plate carton and remove contents CAUTION Failure to properly fill all gaps between the insulation and burner blast tube may result in damage to the...

Страница 26: ...eam Boiler Tapping Location C 3 Blow Off Valve D 3 Return E 3 Plug J1 1 F 3 Plug G 1 1 2 Safety Valve Surface Skim Tap Plug J2 1 Float L W C O 3 4 Plug M 3 4 Operating Pressure Limit Control N 3 4 Hi...

Страница 27: ...1 1 4 X 3 4 BUSHING 24 03 THRU 24 04 1 19 1 UNION CSD 1 EQUIPPED BOILERS PUMPED RETURN 2 38 1 1 4 X 1 BUSHING 24 05 THRU 24 08 1 20 1 X 3 1 2 NIPPLE CSD 1 EQUIPPED BOILERS PUMPED RETURN 2 39 3 4 CLOSE...

Страница 28: ...wn in Figures 25a and 40a Safety valve must be installed in vertical position 7 For boilers with tankless heaters install the operating control in an unused tapping through one of the heater plates 8...

Страница 29: ...29 This Page Is Intentionally Left Blank...

Страница 30: ...ug K 3 4 Probe L W C O C 3 Return M 3 4 Operating Temperature Limit Control D 3 Plug 24 03 thru 24 11 Return 24 12 N 3 4 Hi Temperature Limit Control Manual Reset E 3 Blow Off Drain Valve P 1 2 Plug F...

Страница 31: ...L 1 1 1 18 1 1 4 90 ELBOW 24 11 THRU 24 12 1 9 L4006E1109 CSD 1 EQUIPPED BOILERS 1 19 3 4 CLOSE NIPPLE 24 03 THRU 24 07 1 10 550 PROBE LWCO CSD 1 EQUIPPED BOILERS 1 19 1 CLOSE NIPPLE 24 08 THRU 24 10...

Страница 32: ...relief valve as shown in Figure 40b Relief valve must be installed in vertical position 5 Plug extra boiler tappings 6 Install required bottom blowoff drain valve supplied by others per minimum pipin...

Страница 33: ...ler supply and return If the conditions above cannot be met then parallel piping systems must be converted to a primary secondary arrangement de coupling the system pump from the boiler loop The syste...

Страница 34: ...lection f Glycol Antifreeze Solutions Many systems today use ethylene or propylene glycol antifreeze solutions as a measure for freeze protection as well as a pump lubricator and corrosion inhibitor T...

Страница 35: ...iler return tapping as shown 4 Drain valve ball valve preferable gate valve acceptable alternative supplied by others Minimum valve size per ASME code is 3 4 NPT L E D O M Y L P P U S G N I P I P N I...

Страница 36: ...shown 4 Drain valve ball valve preferable gate valve acceptable alternative supplied by others Minimum valve size per ASME code is 3 4 NPT 5 Proper boiler circulator sizing is listed in Appendix B Pip...

Страница 37: ...f pipe from 3 way bypass port to sensor location 11 feet Bypass line shall be the same diameter as return 6 Minimum linear feet of pipe from point of mixing where bypass meets return line to sensor lo...

Страница 38: ...o L d r o f t r a H s m e t s y s s m e t s y s n r u t e r d e p m u p L BOILER PIPING DOMESTIC HOT WATER DHW APPLICATION This section of the manual identi es the boiler piping details when domestic...

Страница 39: ...24 04 1 NPT 24 05 24 08 1 1 4 NPT 24 09 24 12 Increasing the valve size will improve the blowdown operation In all cases piping connecting blowoff valve to boiler shall be full size to the point of d...

Страница 40: ...40 Figure 35 Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit...

Страница 41: ...mixing valve should be trapped by installing it below the cold water inlet to heater to prevent lime formation in the valve 3 Flushing of Heater All water contains some sediment which settles on the...

Страница 42: ...5 7 5 0 4 2 5 7 6 0 4 2 5 7 5 1 7 0 4 2 5 7 5 1 8 0 4 2 5 7 5 1 9 0 4 2 5 7 5 1 5 2 2 0 1 4 2 5 7 5 1 5 2 2 1 1 4 2 5 7 5 1 5 2 2 2 1 4 2 5 7 5 1 5 2 2 0 3 Notes 1 Ratings are given in gallons per min...

Страница 43: ...ount and connect the actuator as illustrated in Appendix C The electrical connections depend on valve orientation Use Figures 39a and 39b as a guide 2 Return Sensor A sensor has been included with the...

Страница 44: ...o the bracket with 4 8 32 x type F Phillips Pan head screws supplied with the controller The middle 3 rear knockouts should be used before utilizing the 5 knockouts exiting the bottom of the control D...

Страница 45: ...45 Figure 41 Typical Boiler Wiring with RTC Front...

Страница 46: ...46 Figure 42 Typical Boiler with RTC Return Sensor Rear...

Страница 47: ...Close ll valve Note If make up water line is equipped with pressure reducing valve system will automatically ll to normal system design operating pressure Leave globe valve open j Open isolation valve...

Страница 48: ...be tested on initial start up as well as during any troubleshooting exercise Depressing the test button will activate a test sequence and energize the red test light on the front of the control Each...

Страница 49: ...cle until 135 F has been sensed at the return sensor Once the return sensor has sensed a return temperature reading of 135 F after the heat demand cycle has initiated the grace period is terminated Th...

Страница 50: ...the operating aquastat cannot be set lower than 135 20 155 F In reality most systems are designed for a 180 F supply water and 160 F return water The accuracy of the operating aquastat is less than th...

Страница 51: ...until excess water in boiler ows out through supply main and water lowers by steaming until it reaches normal level in boiler Turn off burner Drain boiler Open all radiator valves Reinstall all suppl...

Страница 52: ...added to the system until the boiler pressure gauge registers normal system design operating pressure To insure that the system is full water should come out of all air vents when opened 2 Boiling Ou...

Страница 53: ...the inside Since neither of these failure types are the result of a casting defect the warranty does not apply The maintenance of system integrity is the best method to prevent these types of failure...

Страница 54: ...runs e Tightness of joints f Remove the smoke pipe Remove all accumulations of soot with wire brush and vacuum Remove all obstructions Replace all deteriorated parts and support properly Seal all joi...

Страница 55: ...ount the low water cutoff control from the probe DANGER Assure that the boiler is at zero pressure before removing the LWCO probe Do not rely on the pressure gauge to indicate that the boiler is at ze...

Страница 56: ...ubricate F GENERAL MAINTENANCE CONSIDERATIONS 1 Keep radiators and convectors clean 2 If a hot water radiator is hot at the bottom but not at the top it indicates that air has accumulated inside and s...

Страница 57: ...G A H P 0 6 X 0 0 4 7 0 4 2 3 8 T T E K C E B 0 0 4 1 F C D K 6 6 F C 4 A N A N 0 3 5 6 0 5 1 5 7 2 O G A H P 5 4 X 0 0 5 8 0 4 2 6 9 T T E K C E B 0 0 4 1 F C E E K 6 6 F C 1 A N A N 5 3 5 8 0 5 1 0...

Страница 58: ...The following parts may be obtained from any Crown distributor To nd the closest Crown distributor consult the area Crown representative or the factory at Crown Boiler Co Customer Service P O Box 1481...

Страница 59: ...7W 1 1 5 2 1 1 1 1 330127 330207 331005 331105 24 08W 1 1 6 1 1 1 1 1 1 330128 330208 331006 331106 24 09W 1 1 7 2 1 1 1 1 330129 330209 331007 331107 24 10W 1 1 8 3 1 1 1 1 330130 330210 331008 33110...

Страница 60: ...60 Figure 43 Series 24 Jacket Assembly Boiler Models 24 03 thru 24 12 SECTION VII REPAIR PARTS Continued...

Страница 61: ...TIE BAR ASSY 9 SEC 330349 2 LOWER TIE BAR ASSY 10 SEC 330350 2 LOWER TIE BAR ASSY 11 SEC 330351 2 LOWER TIE BAR ASSY 12 SEC 330352 2 TOP PANEL 3 SEC 330323 1 TOP PANEL 4 SEC 330324 1 TOP PANEL 5 SEC 3...

Страница 62: ...62 Figure 44 Bare Boiler Assembly...

Страница 63: ...CANOPY CARTON 330127 1 8 SEC CANOPY CARTON 330128 1 9 SEC CANOPY CARTON 330129 1 10 SEC CANOPY CARTON 330130 1 11 SEC CANOPY CARTON 330131 1 12 SEC CANOPY CARTON 330132 1 15 1 2 X 2 CERAFELT GASKET 92...

Страница 64: ...SPRING PIN 1 1 OBSERVATION PORT ASSEMBLY INCLUDES OBSERVATION PORT COVER 1 1 OBSERVATION PORT OUTER GASKET 1 1 OBSERVATION PORT GLASS 1 1 OBSERVATION PORT INNER GASKET 1 1 INCLUDES B M P AND ALL ITEMS...

Страница 65: ...BUSHING 95 146 1 3 4 RECESSED HEAD PLUG 950265 3 1 NPT RECESSED HEAD PLUG 950270 4 3 SQ HD PLUG 950273 2 3 X 1 1 4 BLK BUSHING 950275 1 1 1 2 X 4 BLK NIPPLE 950124 1 1 1 2 BLK TEE 950180 1 1 1 2 BLK...

Страница 66: ...4 330855 330856 1 VALVE WITH OUTDOOR RESET 1 1 1 VALVE W O OUTDOOR RESET 1 1 1 1 4 VALVE WITH OUTDOOR RESET 1 1 1 1 4 VALVE W O OUTDOOR RESET 1 1 1 1 2 VALVE WITH OUTDOOR RESET 1 1 1 1 2 VALVE W O OUT...

Страница 67: ...1 TOP FLUE OUTLET CARTON 12 330136 1 BASE RAIL SET 4 5 SEC 330604 1 BASE RAIL SET 6 7 SEC 330606 1 BASE RAIL SET 8 9 SEC 330608 1 BASE RAIL SET 9 10 SEC 330610 1 BASE RAIL SET 11 12 SEC 330612 1 POLYE...

Страница 68: ...X 1 1 4 BLK BUSHING CROWN PART 98 111 980417 980418 980920 980150 90 212 130185 13 074 130190 980419 950098 950192 950274 950510 950515 950520 950525 95 096 950185 95 047 24 03SO 1 1 1 1 1 2 1 1 1 1...

Страница 69: ...WG 1 1 1 1 1 1 1 1 1 1 24 07WG 1 1 1 1 1 1 1 1 1 1 24 08WG 1 1 1 1 1 1 1 1 1 1 24 09WG 1 1 1 1 1 1 1 1 1 1 24 10WG 1 1 1 1 1 1 1 1 1 1 24 11WG 1 1 1 1 1 1 1 1 1 1 24 12WG 1 1 1 1 0 1 1 1 1 1 WATER BOI...

Страница 70: ...t be sized using the sizing charts found in Appendix B 4 Closely spaced tees must connect the branch to the larger header The Tee centerlines must be no greater than 4 times the larger header pipe dia...

Страница 71: ...can be any electrical signal consisting of 24 240 VAC 4 Use isolation relays for circulators greater than 1 3 HP Use motor starters for 3 phase circulators 5 The Outdoor Sensor S3 and the Mix Supply S...

Страница 72: ...y spaced tees must connect the branch to the larger header The Tee centerlines must be no greater than 4 times the larger header pipe diameter 5 The diverting valve V1 must be no greater than 11 linea...

Страница 73: ...for circulators greater than 1 3 HP Use motor starters for 3 phase circulators 6 Connect the Tankless Aquastat A1 if you are not using a storage tank If you are using a storage tank with the tankless...

Страница 74: ...the sizing charts found in Appendix B 4 Closely spaced tees must connect the branch to the larger header The Tee centerlines must be no greater than 4 times the larger header pipe diameter 5 The diver...

Страница 75: ...Heat demand can be any electrical signal consisting of 24 240 VAC 4 The Outdoor Sensor S3 and the Mix Supply Sensor S2 are required if the Outdoor Reset feature is selected 5 Use isolation relays for...

Страница 76: ...the system heater s performance 5 Closely spaced tees must connect the branch to the larger header The Tee centerlines must be no greater than 4 times the larger header pipe diameter 6 The diverting...

Страница 77: ...the RTC should be separate from the burner boiler circuit 3 Heat demand can be any electrical signal consisting of 24 240 VAC 4 Use isolation relays for circulators greater than 1 3 HP Use motor start...

Страница 78: ...B 4 A domestic hot water priority could be used provided the diversion from the heating system loop does not impact the system heater s performance 5 Closely spaced tees must connect the branch to th...

Страница 79: ...120 VAC supplying the RTC should be separate from the burner boiler circuit 3 Heat demand can be any electrical signal consisting of 24 240 VAC 4 Use isolation relays for circulators greater than 1 3...

Страница 80: ...he boiler circulator may be located anywhere within the recirculation loop 4 The balancing valve in the boiler return line V1 may be necessary in low head by pass loop applications 5 Domestic Hot Wate...

Страница 81: ...ay not be separate from the burner boiler circuit 3 Heat demand can be any electrical signal consisting of 24 240 VAC 4 Use isolation relays for circulators greater than 1 3 HP Use motor starters for...

Страница 82: ...stalled at the return of the boiler The boiler circulator may be located anywhere within the recirculation loop 4 The balancing valve in the boiler return line V1 may be necessary in low head by pass...

Страница 83: ...ate from the burner boiler circuit 3 Heat demand can be any electrical signal consisting of 24 240 VAC 4 Use isolation relays for circulators greater than 1 3 HP Use motor starters for 3 phase circula...

Страница 84: ...l a v y a w 3 2 0 5 5 6 1 F l e d o M r e w o P e s a h P 3 r o f r e t r a t S r o t o M e s U r e w o P e s a h P e l g n i S r o f y a l e R l a n o i t i d d A e s U l a i t n e r e f f i D F 0 4...

Страница 85: ...w 3 2 0 5 5 6 1 F l e d o M r e w o P e s a h P 3 r o f r e t r a t S r o t o M e s U r e w o P e s a h P e l g n i S r o f y a l e R l a n o i t i d d A e s U l a i t n e r e f f i D F 0 4 s o f d n...

Страница 86: ...o M 0 8 r e S 5 1 0 5 7 1 e v l a v y a w 3 2 0 5 5 6 1 F l e d o M r e w o P e s a h P 3 r o f r e t r a t S r o t o M e s U r e w o P e s a h P e l g n i S r o f y a l e R l a n o i t i d d A e s U...

Страница 87: ...0 4 e g n a l F 0 3 6 5 8 0 3 3 6 x 4 x 4 0 8 3 4 1 9 8 4 2 1 0 0 2 1 e v l a v y a w 3 2 0 5 5 6 1 F l e d o M r e w o P e s a h P 3 r o f r e t r a t S r o t o M e s U r e w o P e s a h P e l g n i...

Страница 88: ...irection of rotation Determine the direction of rotation and mount the correct label under the plastic front cover of motor Manual Operation Always disconnect power before operating by hand Note posit...

Страница 89: ...89 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 90: ...90 Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 Tel 215 535 8900 Fax 215 535 9736 www crownboiler com D E S I G N E D T O L E A D PN 980417 S24 12 05...

Отзывы: