Short-circuit protection

To minimize susceptibility to single points of failure, F300 Megablocks are provided 
with built-in SpurGuard™ short-circuit protectors, which prevent the entire Fieldbus 
segment from being pulled down in the event of a short circuit on any one of the 
individual field devices or spur cable runs.

NOTE 

During a short circuit, the shorted spur draws more current than a normal 
Fieldbus device - this must be taken into account in segment design.

Diagnostic aids

Each Megablock comes with a green LED to indicate whether DC Power is present, 
and a red LED next to each numbered spur indicates when the spur is in short circuit.

COMPONENTS AND ACCESSORIES

Product part numbers and their descriptions are listed below.

Part Number

Description

F304[-PC]*

4-way Megablock

F308[-PC]*

8-way Megablock

F312[-PC]*

12-way Megablock

F97

Terminator for F300 range of Megablocks

F300-A01-5

Trunk-spur partition – pack of 5

FS32

Spur surge protector module

F300-BAR-5

FS32 grounding bars for trunk - pack of 5

F304-BAR-10 

FS32 grounding bars for F304 - pack of 10 

F308-BAR-10

FS32 grounding bars for F308 - pack of 10 

F312-BAR-10

FS32 grounding bars for F312 - pack of 10 

* The standard connector for the Megablock is a pluggable screw terminal (elevator type).  
Pluggable spring-clamp connectors rely on constant spring pressure to maintain contact with the 
wire.  To order Megablocks with pluggable spring-clamp connectors, add a –PC suffix to the part 
number (i.e. F304-PC). 

† Up to two bars may be required for each Megablock.

MECHANICAL

4 .1  Mounting orientation

Megablocks mount vertically or horizontally on 35mm DIN rail within a field junction 
box  The use of DIN rail end stops are recommended to prevent sliding (especially for 
vertical installations).

Eight, and twelve port Megablocks have areas on their body for labelling so that 
segments can be easily identified according to plant standards.

4 .2  Enclosure requirements

4 .2 .1  General requirements

Megablocks may be mounted in hazardous (classified) areas – see section 8.  The 
following conditions must also be satisfied to ensure safe and reliable operation.
a)  Prevent any form of pollution that could compromise the operation of the unit. 

For example, choose an unpolluted location or a suitable enclosure to protect the 
assembly.

b)  Provide an adequate level of mechanical protection. This can be achieved by 

selecting a protected location, a suitable enclosure, or a combination of both.

c)  Ensure that all cable entries and connections are secure by making provision for 

Содержание MTL F300

Страница 1: ...F300 megablock range MTL fieldbus device couplers July 2019 INM F300 rev 6 Instruction manual MTL fieldbus networks DRAFT 09 July 2019...

Страница 2: ...19 Declaration of Conformity A printed version of the Declaration of Conformity has been provided separately within the original shipment of goods However you can find a copy of the latest version at...

Страница 3: ...5 ELECTRICAL CONNECTIONS 3 5 1 DC Power Requirements 4 5 2 Terminator 4 5 3 Trunk connections 4 5 4 Spur port connections 5 5 5 Cable screen connections 5 5 6 Surge protection 5 6 TESTING 6 6 1 Power...

Страница 4: ...ontents of this manual and the product datasheet Ensure installation and operating personnel have received adequate training for this task Ensure that any operating instructions are fully understood b...

Страница 5: ...n also be fitted to any of the Megablock fieldbus terminals to provide protection against induced surges and transients that can potentially destroy or degrade certain components inside the F300 Megab...

Страница 6: ...ing bars for F312 pack of 10 The standard connector for the Megablock is a pluggable screw terminal elevator type Pluggable spring clamp connectors rely on constant spring pressure to maintain contact...

Страница 7: ...r the ledge of the DIN rail Push the Megablock against the edge of the rail then rotate the Megablock until it sits flat onto the DIN rail then release the pressure to allow the clips on the other sid...

Страница 8: ...minator so that the T F97 molded logo is facing inwards towards the body of the Megablock otherwise difficulty will be experienced in accessing the spring clamp buttons to remove it For screw terminal...

Страница 9: ...onnector provides and cable screen S connections See section 5 5 for information on cable screen grounding Cable screen connections The S screen terminals for the trunk and the spurs are interconnecte...

Страница 10: ...e FS32 and tighten its securing screws 7 Repeat 5 and 6 for all the other FS32 modules A separate grounding bar F300 BAR is used for the trunk connector which must be similarly connected to ground see...

Страница 11: ...is also applicable b This apparatus may be installed in a safe area and also in a Zone 2 location providing that the relevant installation conditions are met When mounted in a Zone 2 location the app...

Страница 12: ...epair This product cannot be repaired by the user and must be replaced with an equivalent certified product NOTE All MTL fieldbus power supplies are designed to protect the fieldbus trunk from transie...

Страница 13: ...t used if the F3xx contains an internal Terminator T part number suffix FM CONTROL DRAWING FOR F3XX MEGABLOCK SERIES FIELDBUS CONNECTION BLOCKS CID2 Zone 2 INSTALLATIONS Doc No 502 484 Rev C 0 Sheet 1...

Страница 14: ...nator Installation DIN Rail Mounting F3xx Megablocks are designed to be mounted on 35 mm DIN rail using the clip mechanism on the back of each unit Mounting can be vertical or horizontal Use of DIN ra...

Страница 15: ...o the apparatus to prevent the rated input being exceeded by transient disturbances of more than 140 of the rated voltage See footnote FISCO Ex ic IIC T4 Gc 1 The apparatus is to be installed in an en...

Страница 16: ...vided by Power Source or Power Supply Sheet 1 of 4 If the Fieldbus Power Supply is protected by a type of protection listed in IEC 60079 0 it may be installed in the Hazardous Area Megablock Part Numb...

Страница 17: ...EXPLOSION HAZARD DO NOT DISCONNECT EQUIPMENT WHEN A FLAMMABLE OR COMBUSTIBLE ATMOSPHERE IS PRESENT except gray spurs Gas Groups IIC IIB IIA C o 80nF 80nF 80nF L o 0 15mH 0 26mH 0 26mH CONTROL DRAWING...

Страница 18: ...ved by Cyrus Kelly Date 10 FEB 2017 Doc No 502 485 Rev E 0 Device Inductance 0 10 H Device Capacitance 0 5nF FISCO ic FNICO Installation Requirements Sheet 3 of 4 Installation to comply with IEC 60079...

Страница 19: ...ide in the two channels on each side of the F3xx until they latch in place at the bottom of the case The channels are sized differently so the Partition cannot be installed backwards If needed the F97...

Страница 20: ...u Street Off Old Mahabalipuram Road Sholinganallur Chennai 600 119 India Tel 91 0 44 24501660 24501857 Fax 91 0 44 24501463 E mail mtlindiasales eaton com ITALY MTL Italia srl Via San Bovio 3 20090 Se...

Отзывы: