
Step 4
a: Check the unit is level.
If levelling is required, use a screwdri-
ver to adjust the hanging position, as
follows:
b: To lift or lower the unit, adjust the
screw shown.
c: To move the unit closer or further
from the wall, adjust the screw shown.
Step 5
Basin Installation
SE0611SRW Basin with deck moun-
ted tap is shown as a typical example
a: Attach the tap to the basin and
carefully bed in the waste using si-
licone only.
b: Carefully apply clear silicone to
the top edges of the unit.
c: Carefully position the basin down
onto the unit, ensure it is centrally
positioned and flush at the back.
Connect the tap and waste.
Apply clear silicone all the way
around the join between the basin/
unit and wall, and around the base
of the basin.
Leave silicone, 24 hours to dry.
Note: Basin waste and tap fittings when over tightened can create stress
within the basin material which may in time cause the failure of the product.
Waste fittings should be carefully bedded in silicone and the back nut hand
tightened an additional quarter turn using a suitable spanner is sufficient to
create the required watertight seal. Care should also be taken when fitting
brassware to tap platforms in order to prevent similar stress related failures.
Step 6
Re-fit drawers:
1: Pull both drawer runners fully out.
2: Set the drawer down onto the runners.
3: Push the drawer fully in.
Test to make sure the drawers operate
correctly and there are no obstructions
behind the drawer.
3