N
2 - 2
5
6
7
4x
4
24H
Place the bath on two wooden blocks over the waste
connections. Connect the waste. Fill the bath with water
and check for leakage.
Place the wedges in position.
The wedges can now be
disposed of.
1. Do not drill through the side of the bath for the waste
connection, only where the overflow template is
provided. Waste pipe is through floor access only.
2. Do not place underfloor heating directly below the
product.