I
nstallation Instruction
s
PARTS SUPPLIED:
Check to make sure all these parts
are included in t
he package:
TOOLS REQUIRED:
• 12” pipe wrench
• 10” adjustable wrench
• Carpente
r’s Level
•
Tape Measure
• Screwdriver
• Putty Knife
• Drill
• Pliers
• For wood floor installation:
-
11/64” drill bit for Mounting Block
• For concrete/tile installation:
-
11/32” drill bit for Mounting Block
MATERIALS REQUIRED:
(Not Included)
• Flexible Supply
T
ube / Connector
• Supply Stop
Valve
2 -
6
Nut - qty. 2
Washer - qty. 2
Cap - qty. 2
Bolt - qty. 2
Clip - qty. 2
Screw - qty. 2
BEFORE INS
TALLATION:
• Mounting (T) Bolts & Nuts (2pc)
•
W
ax Ring / Seal
•
Check for any damage that may have occurred during transport.
Note: Damage claims cannot be made
during or after installation.
• Read these instructions thoroughly before beginning work and retain for future reference.
• Please leave instructions for customers.
These instructions contain maintenance and warranty information.
•
Remove the existing toilet. If new construction, purge the supply line.
12
"
In order to fit correctly
, please check the following dimensi
ons:
1)
The distance between the finished wall and the center of
the
closet flange must be 1
2".
2)
The water supply should be approximately 8” to 10” to the
left
(facing the bowl) from the center line of the closet flange,
and
approximately 6” above the finished floor.
Supply
Valve
Finished
Wall
12”
C/L
Closet
Flange
Protector sleeve
qty. 2
8" to 10"