
3
a:
Attach the tap to the basin
and carefully bed in the waste
using silicone
only
.
b:
Carefully apply silicone to
the top edges of the unit.
c:
Carefully position the basin
down onto the unit, ensure it is
at the back.
Connect the tap and waste.
Apply a bead of silicone to the
join between the basin/unit and
wall, on all 4 sides.
Leave silicone, 24 hours to dry.
basin material which may in time cause the failure of the product. W
should be carefully bedded in silicone and the back nut hand tightened an
in order to prevent similar stress related failures.
Step 4
a:
Check the unit is level.
If levelling is required, use
a screwdriver to adjust the
hanging position, as follows:
b:
To lift or lower the unit,
adjust the screw shown.
c:
To move the unit closer or
further from the wall, adjust the
screw shown.
c
a
a:
Prepare worktop for tap/s
and basin. Cut holes where
required using a suitable sized
hole cutter.
b:
Carefully apply silicone to
the top edges of the unit.
c:
Carefully position the
worktop down onto the unit,
ensure it is centrally positioned
Connect the tap and waste.
Apply silicone to the join
between the worktop and wall,
down sides of the unit and
around the base of the basin.
Leave silicone, 24 hours to dry.
a
c
b
Worktop / Basin Installation
Basin Installation
Important:
All cut edges MUST
be sealed with water proof
sealant or exterior wood varnish.
Step 5
Step 6
a
c
b
DE0002SCW Basin is shown as
a typical example
Inserting the drawer:
Place the drawer on the extended slides.
Slightly lift the drawer at the front and then
push fully closed.
Drawer engages automatically!
Test to make sure the drawer operates correctly.
The hook situated on the back of the runner has
to be fixed in the metal side of the drawer.
Apply silicon where the basin
overhangs the carcass.
Apply silicon where the basin
overhangs the carcass.