Crosswater GLIDE II Series Скачать руководство пользователя страница 2

2

 

Step 1

Step 2

Plan unit position

Decide on the position and height of the unit. The recommended 

basin. 

Step 3

 

 

500 Basin Unit

438mm

113 

mm

 

 

 

 

 

 

700 Basin Unit

638mm

113 

mm

938mm

1000 Basin Unit

113 

mm

860mm - 

870mm

Unit height dependent 

on basin height

860mm - 

870mm

300mm - 

310mm

Basin & Basin Unit Installation 

 

‘Wall bracket’ installation

Removing bracket from the wall

Use the measurements above, to position the ‘wall brackets’.

a: 

Important:

 The measurements given 

above are the maximum the brackets can 

be spaced apart, the brackets must fit 

within that measurement.

b:

 Mark the bracket fixing holes onto 

the wall. Drill Ø 8mm holes, insert the 

wall plugs on solid walls and attach the 

brackets (

c

).  

Important: 

If the basin unit and/or basin are not fitted level this 

may result in the basin not draining correctl

y.

Position the unit on the brackets.

a

cc

Top

b

c

113

36 mm

438 - 638 - 938 mm

52

 

mm mm

aa

 

Profile

200

1200

4800

801 02 Z1 IN

DX
SX

3D

897 AS Z1 60 70

8

6.

2

9

52

9

70

12

36

12

60

2

8

7

801 00   00 

1 9   m m

2 2   m m

3

5

M IN . 1 0
M IN . 1 8

ø 1 0

1

0

.5

1

0

6 0

1

0

4

2

3 2

2 0

3

5

2 2

R

M A

X

4

3D

Fe

70 

Kg

www.camar.i t/warning

Removing the drawer

Pull the drawer out, lift slightly 

aprox. 10 cm before the limit stop.

Pull firmly horizontally until

the drawer audibly disengages,

then lift off.

Содержание GLIDE II Series

Страница 1: ...ded plasterboard walls please use appropriate plasterboard Please ensure the wall can take weight of units detailed above Before installing a wooden bathroom unit into a new property extension or recently plastered room we strongly advise the building room is completely dry well ventilated and adequately heated Important pre installation notes To ensure full working use of the drawers we recommend...

Страница 2: ...that measurement b Mark the bracket fixing holes onto the wall Drill Ø 8mm holes insert the wall plugs on solid walls and attach the brackets c Important If the basin unit and or basin are not fitted level this may result in the basin not draining correctly Position the unit on the brackets a c c Top b c 113 36 mm 438 638 938 mm 52 mm mm a a Profile 200 1200 4800 801 02 Z1 IN DX SX 3D 897 AS Z1 60 7...

Страница 3: ...e worktop for tap s and basin Cut holes where required using a suitable sized hole cutter b Carefully apply silicone to the top edges of the unit c Carefully position the worktop down onto the unit ensure it is centrally positioned Connect the tap and waste Apply silicone to the join between the worktop and wall down sides of the unit and around the base of the basin Leave silicone 24 hours to dry...

Страница 4: ...el engages automatically and is fixed Step 3 Eccentric height adjustment on both sides Release locking screws on both sides Tighten locking screws Step 4 Side adjustment right Turn adjustment Only the right hand side has to be operated due to the integrated lateral adjustment Step 5 Front tilt angle adjustment With rectangular railings tilt angle adjustment of the front is via the front panel hold...

Страница 5: ...er in the cam bolt and slide it to the left The front panel is now released and can be removed Insert the front panel into the drawer sides and repeat the operation insert the screwdriver in the cam bolt and slide it to the right The drawer in installation Assembly and disassembly of cam bolt construction drawers Steps b a c d Crosswater Glide II Single Drawer Unit indd 5 28 2 12 13 35 27 ...

Отзывы: