Crosswater GLIDE II Series Скачать руководство пользователя страница 1

Please read these instructions carefully before starting installation 

and keep in a safe place for future reference. ENSURE the room is well 

heated and ventilated. 

 

Check the contents of the pack carefully before installation. Bauhaus will 

y product has 

If any fault is found with materials or workmanship, it must be reported 

immediately to the manufacturer. Remedial action will be taken, based on 

information received, on condition that: 1. Full details are supplied to the 

 

3. The manufacturer is informed of any damage/shortages prior to 

installation. 4. The product has not been installed, or attempts have been 

made to install.
We do not accept responsibility for any problems that may occur through 

incorrect installation.

Advice & Safety

 Plumber/ 

product guarantee maybe considered invalid. For a claim made under our 

can be required.

tting to avoid 

unnecessary damage occurring.
It is recommended that the furniture and accessories are installed after 

product to be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise 

due care at all times.
Please note that some units are heavy. Always take care when lifting, and 

follow health and safety guidelines. It is recommended that 2 people carry 

out the installation of larger basin/vanity units over 30Kgs gross weight. 

Warning!

 Please check for any hidden pipes or electrical cables before 

When using power tools always follow the manufacturer’s user instructions.

 bathroom has 

studded/plasterboard walls, please use appropriate plasterboard

Please ensure the wall can take weight of units detailed above. Before 

installing a wooden bathroom unit into a new property, extension or recently 

plastered room we strongly advise the building/room is completely dry, well 

ventilated and adequately heated.

Important pre-installation notes

To ensure full working use of the drawers we recommend the use of 

Bauhaus basin furniture trap BTR0410W.

Care & Cleaning

Cast mineral marble products should be cleaned regularly with warm soapy 

water, then rinsed with clean water and, if desired, dried and polished with 

a soft cloth. Lime scale deposits can be removed using a 50:50 solution of 

warm water and lime scale remover and soft clean cloth. We recommend 

regular cleaning with Bauhaus Cream Polish SD150RW, specially 

formulated to clean and help protect the surface of cast mineral marble 

basins.
Do not use abrasive cleaners or bleach in this will permanently damage the 

high gloss surface.

urniture 

carcasses.
If any maintenance is required then it must be carried out by a

Plumber.

ions without 

prior notice.

IMPORTANT - Advice and safety - Please read before installation

Tools & equipment needed:

 Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil,  

Silicone sealant (clear).

BATHROOM FURNITURE RANGE

GLIDE II

INSTALLATION INSTRUCTIONS 

500 Two Drawer Basin Unit, 

Ceramic / Cast Marble Basin / Worktop

GL5000T

GL7000T

GL1000T

DE0004SRW

DE0003SRW

DE0002SRW

x8

x2

700 Two Drawer Basin Unit, 

Ceramic / Cast Marble Basin / Worktop

1000 Two Drawer Basin Unit, 

Ceramic / Cast Marble Basin / Worktop

x8

x2

x8

x2

DE0004SCW

DE0003SCW

DE0002SCW

1

Содержание GLIDE II Series

Страница 1: ...ded plasterboard walls please use appropriate plasterboard Please ensure the wall can take weight of units detailed above Before installing a wooden bathroom unit into a new property extension or recently plastered room we strongly advise the building room is completely dry well ventilated and adequately heated Important pre installation notes To ensure full working use of the drawers we recommend...

Страница 2: ...that measurement b Mark the bracket fixing holes onto the wall Drill Ø 8mm holes insert the wall plugs on solid walls and attach the brackets c Important If the basin unit and or basin are not fitted level this may result in the basin not draining correctly Position the unit on the brackets a c c Top b c 113 36 mm 438 638 938 mm 52 mm mm a a Profile 200 1200 4800 801 02 Z1 IN DX SX 3D 897 AS Z1 60 7...

Страница 3: ...e worktop for tap s and basin Cut holes where required using a suitable sized hole cutter b Carefully apply silicone to the top edges of the unit c Carefully position the worktop down onto the unit ensure it is centrally positioned Connect the tap and waste Apply silicone to the join between the worktop and wall down sides of the unit and around the base of the basin Leave silicone 24 hours to dry...

Страница 4: ...el engages automatically and is fixed Step 3 Eccentric height adjustment on both sides Release locking screws on both sides Tighten locking screws Step 4 Side adjustment right Turn adjustment Only the right hand side has to be operated due to the integrated lateral adjustment Step 5 Front tilt angle adjustment With rectangular railings tilt angle adjustment of the front is via the front panel hold...

Страница 5: ...er in the cam bolt and slide it to the left The front panel is now released and can be removed Insert the front panel into the drawer sides and repeat the operation insert the screwdriver in the cam bolt and slide it to the right The drawer in installation Assembly and disassembly of cam bolt construction drawers Steps b a c d Crosswater Glide II Single Drawer Unit indd 5 28 2 12 13 35 27 ...

Отзывы: