FP3000 RAID
USER'S
MANUAL
9
CROSS T.E.C
www.crossups.com
3.
DELIVERY
&
INSTALLATION
3.1.
Delivery
3.1.1.
Advice
When
delivering
the
UPS,
the
weight
lifter
of
more
capacity
than
the
UPS's
weight
is
necessary
and
it
should
be
applied
to
the
bottom
support
of
UPS
or
the
bottom
part
of
the
container.
Also,
the
equipment
should
not
be
neither
shaken
nor
vibrated.
If
forced
by
nature,
avoid
the
inclination
of
the
equipment
more
than
15
from
the
horizon.
3.1.2.
Shipment
inspection
-
Inspect
the
delivered
equipment
in
detail
for
any
missing
part
or
any
visible
damage.
If
found
any,
notify
CROSS T.E.Co.
immediately.
-
Never
apply
any
sharp
edged
material
or
tool
to
the
equipment.
-
Avoid
any
form
of
physical
shock
to
the
equipment.It
may
cause
the
malfunction
of
the
system.
3.1.3.
Storage
Before
Installation
Before
installation,
the
UPS
needs
to
be
stored
in
a
protected
place
from
humidity,
dust
and
other
damaging
factors
to
the
system
performance.
3.2.
INSTALLATION
3.2.1.
Condition
for
installation
-
Ambient
Temperature
:
0
C
-
40
C
-
Relative
Humidity
:
Below
95%
Non-Condensing
-
Operating
Altitude
:
Up
to
1000m
above
sea
level
Note
:
This
equipment
is
designed
for
indoor
usage.
Avoid
installation
where
exposed
to
rain,
wind,
direct
sunlight,
heat,
and
other
damaging
factor.