background image

 FP3000 RAID 

USER'S

 

MANUAL

                                           

 

1

   

CROSS T.E.C  

www.crossups.com

 

 

 

 
 
 
 
 
 

 

     

USER'S

 

MANUAL 

    Frontier power 

-3000 

 

U

NINTERRUPTIBLE

 

P

OWER

 

S

YSTEM

 

 

 
 
 
 

 

 
 

     

                     

 

 
 
 
 

 

CROSS T.E.C

 

Co.,

 

Ltd.

 

Содержание FP3000

Страница 1: ...FP3000 RAID USER S MANUAL 1 CROSS T E C www crossups com USER S MANUAL Frontier power 3000 UNINTERRUPTIBLE POWER SYSTEM CROSS T E C Co Ltd...

Страница 2: ...ery 3 2 Installation 4 OPERATION PROCEDURE 4 1 Preoperational Requirement 4 2 Preparations 4 3 Operational Procedure 4 4 Ending Operation Procedure 4 5 Emergency Operation 5 MAINTENANCE AND SERVICES 5...

Страница 3: ...onfident and widely known representative product The F3000 RAID Uninterruptible Power System of CROSS TEC is a truly advanced 3 phase on line sine wave UPS which Utilizes new power electronic technolo...

Страница 4: ...sipation board and many other components It will convert input AC power to DC power supply the inverter and simultaneously charge the battery with the best condition possible Also the filtering circui...

Страница 5: ...he moment of detection of any abnormal operation in inverter or over load condition the static switch will simultaneously transfer the power supply to bypass feed commercial power not to interrupt the...

Страница 6: ...quency measurement for each phase 2 Operating condition Rectifier in operation RECT ON Rectifier out of operation RECT OFF Battery equalize charging EQU Battery float charging FLO Inverter in operatio...

Страница 7: ...the battery stops to feed and starts to recharge At the same time the commercial power passes through the normal routine 2 3 4 Internal Failure Over load The output voltage and frequency of inverter...

Страница 8: ...HASE 3 4 W RATED VOLTAGE 380V VOLTAGE STABILITY Within 2 RATED FREQUENCY 60 Hz 0 5 Hz VOLTAGE REGULATION Within 5 RESPONSE TIME Less Than 20mS VOLTAGE ADJUSTMENT Over 5 WAVEFORM DISTORTION Less than T...

Страница 9: ...issing part or any visible damage If found any notify CROSS T E Co immediately Never apply any sharp edged material or tool to the equipment Avoid any form of physical shock to the equipment It may ca...

Страница 10: ...t terminal battery cables need to be connected as well with enough care and concern about the positive and the negative cables Note All the connections are to be made FIRM 4 OPERATION PROCEDURE 4 1 Pr...

Страница 11: ...ON 4 3 2 Turn the battery circuit breaker CB2 ON According to the amount of charging current detection FLO LED or EQU LED will light ON 4 3 3 PRESS ON button and ENABLE button simultaneously for the I...

Страница 12: ...switch together to halt the INVERTER operation and to transfer to bypass mode 4 4 3 Turn OFF the battery circuit breaker CB2 4 4 4 Turn OFF the bypass circuit breaker CB4 4 4 5 Turn OFF the input cir...

Страница 13: ...ational range 5 1 3 Ambient surrounding condition out of operational range 5 1 4 Misuse 5 1 5 Component failure 5 1 6 etc 5 2 Handling The static UPS shall be treated and used as a delicate and sensit...

Страница 14: ...urement F To check the frequency measurement A To select the power condition of phase R B To select the power condition of phase S C To select the power condition of phase T ON To start the INVERTER o...

Страница 15: ...intenance is required It is advisible to record the operational behavior in routine bases for smooth operation and easy service if necessary CATEGORY DESCRIPTION REMARK AC INPUT LED BYPASS INPUT LED I...

Страница 16: ...N REMARK ANY DAMAGE ALARMING CONDITION LED INDICATIONS CIRCUIT BREAKERS STATUS LOAD CONDITION REPLACEMENT OTHER STATUS INPUT LINE INVERTER ON BYPASS ON FAULT BUZZER CONDITION SOLUTION ON ON Normal ON...

Страница 17: ...ON Button 2 If no change call for service FAULT LED is ON Alarm sounds continuously 2 INPUT LINE LED is OFF 1 Possibly battery cut off 2 If the power recovers PRESS OFF RESET Button 3 If no change ca...

Страница 18: ...l abuse improper installation unauthorized service or modification If it becomes necessary to send a defecting unit to CROSS T E Co the product shall be shipped in its original package or with adequat...

Отзывы: