background image

2.4  Operation

1. Set the on board controls as desired (see Sections 2.3.1 and 2.5, and Figure 2.1).
2. Install the 1582-22L in the equipment rack.
3. Connect signals to the BNC connectors (J1-J6 and J8-J13).
4. Connect to signals on the MONITORS AND CONTROLS connector, J7, as desired 

(see Figure 2.2, Table 2.1).

5. Connect power via two power cords to AC1 and AC2.
6. Manually switch between channels 1 and 2 and be sure switching occurs.
7. Switch to AUTO. Alarm channel 1 and note that automatic switching occurs. Remove alarm to CH1 

and note that the output switches as desired. Push RESET if in LATCH mode. Repeat for CH2.

8. Check that CH1 and CH2 are selected when in AUTO and momentary ground is applied to J7 pins 1 

and 2.  Momentarily ground Remote Reset pin 4 on J7 if in LATCH mode to return to AUTO operation.

AC Fuse - 2 amp slow blow (Type T), 
5 mm X 20 mm

FUSE DRAWER

SPARE FUSE

~

INPUT

100-240± 10%VAC

47-63 Hz

2A MAX

FUSE

TYPE T 2A GDC

250 VOLT

FOR 100 - 240 V~

~

FIGURE 2.4    Fuse and Spare Fuse Locations

1582-22L Manual, Rev. C

 

     Page 9

    

    06/13/11

Содержание 1582-22L

Страница 1: ...prietary to Cross Technologies Inc but may be reproduced or duplicated without the prior permission of Cross Technologies Inc for purposes of operating the equipment Printed in USA When ordering parts...

Страница 2: ...r Cross Technologies Inc s obligation under this warranty is limited to repairing or at Cross Technologies Inc s option replacing parts subassemblies or entire assemblies Cross Technologies Inc shall...

Страница 3: ...te selection after return to AUTO AUTO switching occurs only if current channel alarms and other channel is clear When power is lost and when power is applied as alarms at power up dictate the selecte...

Страница 4: ...INE Turns green when Channel 2 is selected MANUAL Turns red when the Manual Select switch manually selects channel 1 or 2 ALARM CH1 Turns red when Channel 1 alarm input is a closure or open selectable...

Страница 5: ...witching power supplies provide power for the assembly The 1582 22L can be secured to a rack using the 4 holes on the front panel JP1 JP3 JP4 JP2 S4 ROCKER SWITCH DETAIL SHOWN WITH ALL SWITCH POSITION...

Страница 6: ...H1 5 NC Not Connected 6 SWITCH COMMON Common pin for SWITCH 1 2 7 GROUND Ground 8 MANUAL Open collector output 5 to GND when in MANUAL mode 9 REMOTE Open collector 5 to GND when in REMOTE mode 10 GROU...

Страница 7: ...UTO CH2 CH2 ONLINE MANUAL REMOTE SWITCH RESET CH1 ONLINE 2 1 2 1 POWER 2 1 DS5 CH2 ONLINE LED Lights green when CH2 is selected S2 HISTORY RESET Push button resets ALARM HISTORY LEDs only DS3 MANUAL L...

Страница 8: ...1582 22L switches to channel 2 until the alarm on channel 1 clears and then the 1582 22L switches back to channel 1 automatically JP3 normal position dot JP4 CH2 Alarm Enable Ignore 3 pin jumper Dott...

Страница 9: ...ing occurs 7 Switch to AUTO Alarm channel 1 and note that automatic switching occurs Remove alarm to CH1 and note that the output switches as desired Push RESET if in LATCH mode Repeat for CH2 8 Check...

Страница 10: ...hes from CH1 to CH2 if CH1 alarms and CH2 is good Latches to CH2 Push Reset or ground Remote Reset pin to return to CH1 if it has no alarm or both CH1 and CH2 are in alarm Non dot JP1 JP4 Dot JP2 JP3...

Страница 11: ...equipment is not compromised Additional space between unit may be required E Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the effect t...

Страница 12: ...INC 6170 Shiloh Road Alpharetta Georgia 30005 770 886 8005 FAX 770 886 7964 Toll Free 888 900 5588 WEB www crosstechnologies com E MAIL info crosstechnologies com Printed in USA 1582 22L Manual Rev C...

Отзывы: